Engineering delays don’t announce themselves — they accumulate.

Without remote engineers, small capacity gaps turn into missed deadlines and cost overruns.

Hire Remote Engineers & Save Up to 70%

Experienced, technically skilled engineers trained to support design, analysis, documentation, and project delivery — fully onboarded and ready to integrate with your team.

Why Hire Remote Engineers?

Stop delaying projects, overloading senior engineers, or struggling to scale technical capacity during peak workloads.

We match you with experienced remote engineers trained to support complex engineering tasks, documentation, and analysis — without the cost of local hires.

Trained in AutoCAD, Revit, Civil 3D, SolidWorks, ANSYS, ETABS, SAP2000, MATLAB

Skilled in design support, calculations, drafting, modelling, and technical documentation

Experienced supporting infrastructure, construction, manufacturing, utilities, and industrial projects

Strong understanding of standards, compliance requirements, and QA processes

Fast onboarding – engineers ready in 7–14 days

Save up to 70% compared to local engineering hires

What You Get

Every Engineer you hire through Remote Staff offers:

  • 3–8 years’ experience across engineering disciplines
  • Solid grounding in engineering principles, calculations, and technical workflows
  • Clear English communication and strong documentation habits
  • Dedicated account management & replacement guarantee
  • Transparent rates, easy onboarding

Engineering delays don’t announce themselves — they accumulate.

Without remote engineers, small capacity gaps turn into missed deadlines and cost overruns.

Hire Remote Engineers & Save Up to 70%

Experienced, technically skilled engineers trained to support design, analysis, documentation, and project delivery — fully onboarded and ready to integrate with your team.

Why Hire Remote Engineers?

Stop delaying projects, overloading senior engineers, or struggling to scale technical capacity during peak workloads.

We match you with experienced remote engineers trained to support complex engineering tasks, documentation, and analysis — without the cost of local hires.

Trained in AutoCAD, Revit, Civil 3D, SolidWorks, ANSYS, ETABS, SAP2000, MATLAB

Skilled in design support, calculations, drafting, modelling, and technical documentation

Experienced supporting infrastructure, construction, manufacturing, utilities, and industrial projects

Strong understanding of standards, compliance requirements, and QA processes

Fast onboarding – engineers ready in 7–14 days

Save up to 70% compared to local engineering hires

What You Get

Every engineer you hire through Remote Staff offers:

  • 3–8 years’ experience across engineering disciplines
  • Solid grounding in engineering principles, calculations, and technical workflows
  • Clear English communication and strong documentation habits
  • Dedicated account management & replacement guarantee
  • Transparent rates, easy onboarding

Remote Engineers in ANY Industry!


Engineering Requirements Submission
Discipline needs, project scope, tools


Workflow & Scope Review
Standards, deliverables, timelines


Engineering Delivery Using Tools
Design software, models, calculations


Review & Optimization Loop
Checks, revisions, compliance validation


Ongoing Engineering Support
Design updates, documentation, analysis

Everything is done remotely, with full data security and confidentiality.

Your All-In-One Guide to Hiring an Engineer

Whether you’re building a bridge, a data platform, or a cutting-edge product, you need more than just good ideas. You need experts who can bring those ideas to life with precision, innovation, and efficiency. You need to hire an engineer.

Your All-In-One Guide to Hiring an Engineer

Whether you’re building a bridge, a data platform, or a cutting-edge product, you need more than just good ideas. You need experts who can bring those ideas to life with precision, innovation, and efficiency. You need to hire an engineer.

Browse Our Engineers

Get A FREE Engineering Specialist Shortlist — Start ASAP

Candidates:

45

Filter by Role:

*Booking interviews depend on candidates' availability and interest.

All-inclusive Rate: USD $8.43/hr

Marvin

Candidate ID: 422815


ADVANCED

    AutoCAD, 2D Design, 2D Modeling, ETABS...

INTERMEDIATE

    Design Development, Layout Design, 3D Modeling...

Employment Preferences

Availability:
Full Time Part Time
Preferred Timezone:
Australian Central Standard Time
Hourly & Monthly Rate:
(inclusive of service fee)

*Plus GST for Australian Businesses

Part Time: $USD 7.21 per hour or $USD 625.14 per month

Full Time: $USD 8.43 per hour or $USD 1461.50 per month

Remote Staff Recruiter Comments

  • Working as a Site Design Engineer
  • In Previous job he handled Motor Control Centers in a Waste Water Treatment plant
  • Assigned as a Design Engineer in Sri Lanka 
  • Has experience in layout short Circuit Calculation, Short Circuit Calculation Analysis, Lux Calculation,  Genset Required kVA rating, Transformer kVa rating, Capacitor Bank required rating and Voltage Drop Calculation.
  •  His Electrical Design Specification are Lighting & Power Layout, Auxillary Layou (FDAs, CCTV, Voice & Data, Etc.,),Cable Tray Layout, Power Receiving & Distribution Layout ,Lighting & Power Schedule of Loads, Lighting & Power Single Line Diagram Electrical Panel Design, Panel Layout and Schedule of Load
  • Had an experience doing electrical design in Residential and Commercial Buildings Specifically in condominium.
  • Done Electrical system design using Low voltages and high voltages
  • Has good communication skills can express himself well

Employment History

Cadet Electrical Engineer

Industry:

Manufacturing / Production

Employment Period:

October 2013 to April 2014 (6 Months)

Duties and Responsibilities:

  • Responsible for the monitoring, operation, repair and maintenance of overhead cranes, motors, auxillary switches, cooling towers, sensors, cooling bed, kick off and all electrically operated machines and equipments to ensure good condition and continous production of rebars and promote safety throughout the whole plant.
  • Coordinate to Plant Supervisor regarding the schedule of machine for Preventive Maintenance, ensure parts and materials needed for auxiliary devices are readily available.
  • Electrical installation works and preventive maintenance of substation (tightening of bolts and connectors, Thermal scanning transformer, bus bars). Additional Task is given by Supervisor from time to time.

Property Engineer

Industry:

Property / Real Estate

Employment Period:

May 2014 to May 2015 (12 Months)

Duties and Responsibilities:

  • Responsible for the overall technical aspects of the assigned property, including Construction Monitoring,
  • Preventive Maintenance Programs,
  • Daily Operations and Property Enhancement.
  • In the absence of Property Manager/Administrator, responsibility will be extended to four major functions i.e
  • Operations, Finance, Property Enhancement and Community Development.

Electrical Engineer

Industry:

Utilities / Power

Employment Period:

June 2015 to December 2018 (42 Months)

Duties and Responsibilities:

  • Short Circuit Calculation Analysis
  • Lux Calculation
  • Genset Required kVA rating
  • Transformer kVa rating
  • Capacitor Bank required rating
  • Voltage Drop Calculation
  • Electrical Design Specification
  • Lighting & Power Layout
  • Auxillary Layou (FDAs, CCTV, Voice & Data, Etc.,)
  • Cable Tray Layout
  • Power Receiving & Distribution Layout
  • Lighting & Power Schedule of Loads
  • Lighting & Power Single Line Diagram
  • Panel Layout
  • Schedule of Loads
  • Single Line Diagram
  • Control Wiring Diagram
  • Components List
  • Request for Quotation
  • Purchase Request/Order
  • Data Sheets & Brouchures
  • Follow up Delivery from Supplier’s
  • Review and align Electrical Design Drawings to ensure compliance with design specifications and guidelines
  • Coordinate plans and specifications with other discipline engineers, identifying and clarifying discrepancies.
  • Provide onsite support on electrical installations.
  • Troubleshoot/find solutions when technical and project conflict arises.
  • Work with Electrical Manager(s) to perform cost budget & forecast.
  • Manage Electrical Sub-contractors.

Design Electrical Engineer/ Site Supervisor

Industry:

Construction / Building / Engineering

Employment Period:

June 2015 to April 2020 (58 Months)

Duties and Responsibilities:

  • Product Brochures and Data Sheets Evaluation
  • Design Electrical Calculations i.e(Load calculations, wire sizing, breaker sizing,short circuit calculations,lux level calculations)
  • Design Layouts and Drawings using CAD ( MCC Panel Layouts, Local Panels, Power and Lighting Layouts, Grounding Layouts, Single Line Diagrams)
  • Site Supervision and Installations
  • Commissioning In Charge
  • Shop Drawings, As-Built Drawings
  • Client Inspections and Approval Facilitator
  • Costs Control
  • Material controller

Site Electrical Engineer

Industry:

Construction / Building / Engineering

Employment Period:

January 2021 to July 2021 (5 Months)

Duties and Responsibilities:

  • Office Works
  • Request for Quotation
  • Purchase Request/Order
  • Follow up Delivery from Supplier’s
  • TDD (Technical Due Diligence) Works
  • Review and align Electrical Design Drawings to ensure compliance with design specifications and guidelines
  • Coordinate plans and specifications with other discipline engineers, identifying and clarifying discrepancies.
  • Provide onsite support on electrical installations.
  • Troubleshoot/find solutions when technical and project conflict arises.
  • Work with Electrical Manager(s) to perform cost budget & forecast.
  • Manage Electrical Sub-contractors.

ELECTRICAL AND CONTROLS ENGINEER

Industry:

Construction / Building / Engineering

Employment Period:

June 2023 to Present

Duties and Responsibilities:

  • Review shipyards inquiry and/or purchase order specifications
  • Prepare contract offer together with other disciplines.
  • Review HVAC Electric Equipment
  • Manufacturing drawings
  • Review and draw electrical controls and specifications
  • Assists sales promotions and other engineering design works
Projects Handled
  • Chevron Jansz-Io Compression LNG Project
  • ABB/MODEC BM-CC-33 Ehouse

Sr. Design E&I Engineer

Industry:

Construction / Building / Engineering

Employment Period:

October 2021 to June 2023 (20 Months)

Duties and Responsibilities:

  • Electrical Design Analysis and Calculations
  • Provide Technical evaluations on Waste Water Technology Solutions
  • Provide Supervisions for Various Solar Powered Irrigation Projects
Projects Handled
  • BNR Upgrade of Various Waste Water and STP Plant (11 Sites)
  • Design and Build of Alviera Estate STP Cluster 2 - 9.07MLD

Education History

Field of Study:

Engineering (Electrical/Electronic)

Major:

Electrical Engineering

Graduation Date:

May 10, 2013

Located In:

Philippines

License and Certification: :

PRC Board Passser License #:REE 52596


Skills

ADVANCED ★★★

    AutoCAD, 2D Design, 2D Modeling, ETABS,

INTERMEDIATE ★★

    Design DevelopmentLayout Design3D Modeling

Work at Home Capabilities:

  • Internet Bandwidth: Between 5mbps to 100mbps
  • Working Environment: Private Room
  • Speed Test Result:
  • Internet Type: Broadband
  • Hardware Type: Desktop
  • Brand Name: Customized
  • Processor: AMD
  • Operating System: Windows 10

All-inclusive Rate: USD $10.78/hr

Milbert

Candidate ID: 422572


ADVANCED

    Digital Photography, Adobe Photoshop CS3, BlueBream, PlanSwift...

INTERMEDIATE

    Revit Architecture, AutoCAD...

Employment Preferences

Availability:
Full Time Part Time
Preferred Timezone:
Australian Western Standard Time
Hourly & Monthly Rate:
(inclusive of service fee)

*Plus GST for Australian Businesses

Part Time: $USD 10.78 per hour or $USD 933.84 per month

Full Time: $USD 10.78 per hour or $USD 1867.67 per month

Remote Staff Recruiter Comments

  • Milbert has been in the Engineering field for more than 3 years.
  • His experience in Engineering include:
    • General estimation 
    • Used Revit in drafting, had a little experience using AutoCAD
    • Project Planning
  • He is also an experienced photographer
    • Spearheaded the photoshoot of a Bb. Pilipinas candidate
    • Adept in Adobe Photoshop
    • Knowledgeable in Adobe Lightroom
  • He can start immediately

Employment History

PROFESSOR

Industry:

Education

Employment Period:

June 2016 to November 2016 (5 Months)

Duties and Responsibilities:

  • College Adviser
  • Grade 11 Adviser
  • College Algebra Instructor
  • Grade 11 Algebra Instructor
  • Business Math Grade 11 Instructor

OFFICE / SITE ENGINEER

Industry:

Construction / Building / Engineering

Employment Period:

January 2017 to June 2017 (5 Months)

Duties and Responsibilities:

  • Project In-charge
  • Site Monitoring
  • Project Scheduling
  • Materials Estimator
  • Daily Reports
  • Billing Documents

PROJECT ENGINEER

Industry:

Construction / Building / Engineering

Employment Period:

June 2017 to November 2017 (5 Months)

Duties and Responsibilities:

  • Develops project objectives by reviewing project proposals and plans; conferring with management.
  • Determines project responsibilities by identifying project phases and elements; assigning personnel to - phases and elements; reviewing bids from contractors.
  • Determines project specifications by studying product design, customer requirements, and performance - standards; completing technical studies; preparing cost estimates.
  • Confirms product performance by designing and conducting tests.
  • Determines project schedule by studying project plan and specifications; calculating time requirements; sequencing project elements.
  • Maintains project schedule by monitoring project progress; coordinating activities; resolving problems.
  • Controls project plan by reviewing design, specifications, and plan and schedule changes; recommending actions.

SALES ESTIMATOR

Industry:

Construction / Building / Engineering

Employment Period:

February 2018 to June 2019 (16 Months)

Duties and Responsibilities:

  • Site Costing for Drafting Site works.
  • Prepares work to be estimated by gathering proposals, site plans, specifications, and related documents.
  • Identifies material by studying proposals, blueprints, specifications, and related documents (Building Design Covenant) .
  • Computes costs by analyzing material
  • Resolves discrepancies by collecting and analyzing information.
  • Presents prepared estimate by assembling and displaying numerical and descriptive information.
  • Prepares special reports by collecting, analyzing, and summarizing information and trends.
  • Maintains cost data base by entering and backing up data.
  • Maintains technical knowledge by attending educational workshops; reviewing technical publications.
  • Contributes to team effort by accomplishing related results as needed.

Education History

Field of Study:

Engineering (Civil)

Major:

Civil Engineering

Graduation Date:

April 19, 2016

Located In:

Philippines

License and Certification: :

N/A


Skills

ADVANCED ★★★

    Digital Photography, Adobe Photoshop CS3, BlueBream, PlanSwift,

INTERMEDIATE ★★

    Revit ArchitectureAutoCAD

Work at Home Capabilities:

  • Internet Bandwidth: 25 Mbps
  • Working Environment: Private Room
  • Speed Test Result:
  • Internet Type: Fiber
  • Hardware Type: Desktop
  • Brand Name: Intel
  • Processor: Intel Core i3
  • Operating System: Windows 8

All-inclusive Rate: USD $9.37/hr

Mark

Candidate ID: 402200


ADVANCED

    Mechanical Engineering, AutoCAD, Analytical Skills, Clerical Skills...

INTERMEDIATE

    Communication Skills, Critical Thinking, Listening Skills, Client Presentations...

Employment Preferences

Availability:
Part Time Full Time
Preferred Timezone:
US Pacific Standard Time Australian Western Standard Time
Hourly & Monthly Rate:
(inclusive of service fee)

*Plus GST for Australian Businesses

Part Time: $USD 9.51 per hour or $USD 824.17 per month

Full Time: $USD 9.37 per hour or $USD 1623.97 per month

Remote Staff Recruiter Comments

Evaluation Comment

Mark has a solid background in mechanical engineering with experience in both design and project implementation. His expertise in HVAC systems, cooling systems, and mechanical infrastructure is well supported by his advanced technical skills in AutoCAD, material cost estimation, and mechanical design. His hands-on experience in both engineering and project management, combined with a strong understanding of international standards, makes him a well-rounded candidate for roles requiring both technical design and project oversight.

Strengths:

  • Strong technical skills in mechanical engineering and design, with advanced proficiency in AutoCAD and cost estimation.
  • Extensive experience in designing HVAC and cooling systems for large-scale commercial projects.
  • Familiarity with international mechanical and safety standards.
Skills:
  • Mechanical Engineering (Advanced)
  • AutoCAD (Advanced)
  • Analytical Skills (Advanced)
  • Microsoft Office/Excel (Advanced)
  • 2D/3D Design (Advanced)
  • Material Cost Estimation (Advanced)
  • Communication and Critical Thinking Skills (Intermediate)
  • Mark is a Mechanical Engineer with more than six (6) years of work experience with specialization on HVAC and fire protection.
  • He has good communication skills, very professional.
  • His proficiency lies in crafting layouts and blueprints for ventilation, air conditioning, ductworks, chilled water piping, and equipment arrangement.
  • Additionally, he possesses skills in space planning and conducting calculations for cooling load, ventilation, air quality, smoke extraction, and more.
  • He prepares technical specifications, review and evaluate all submittals which includes quotes and technical documentation of equipment proposals. He also ensures that all documents and design is in compliance with the codes and standards.
  • He has contributed to various projects involving offices, residences, commercial spaces, mixed-use buildings, and restaurants, ensuring compliance with relevant codes and standards such as ASHRAE, NFPA, SMACNA, and others.
  • He executed tasks related to space planning, calculations (including cooling load, mechanical ventilation, indoor air quality, smoke extraction, stairwell pressurization, fireman’s lift pressurization, etc.), and the layout of mechanical plans. This involved handling equipment and layout configurations, ductworks, refrigerant and chilled water piping layouts, and other mechanical details.
  • He gained experience in preparing quotations while managing several projects during his freelance work.
  • In his recent role, he collaborated as a cooling estimator with an Australian client, offering engineering assistance for Precision cooling products like CRACs, Chillers, and similar items. His responsibilities included reviewing technical documentation and delivering technically compliant product selections aligned with project requirements. He generated quotations, prepared comprehensive compliance reports, and coordinated with the Business Development Manager (BDM), suppliers, and other team members to stay informed about project status and updates. Additionally, he managed cases within the CRM system.
  • He is proficient in using AutoCAD, MS office, Duct sizer, Pipe sizer, HAP-E20, Excel, and Hourly analysis program for précised cooling.
  • He can start by January of 2024.
Predictive Index Behavioral Profile - Specialist

Strongest Behaviors
  • Detail-oriented and precise; follow-through is deep and literal to ensure tasks were completed in accordance with quality standards.
  • Operationally, as opposed to socially, focused. Thinks, in specific terms, about what needs to be done and how to do it accurately and flawlessly; follows, in a literal way, that execution plan.
  • Detail-oriented and thorough; works to ensure things don’t fall through the cracks, and follows up to ensure they’re done properly and on time.
Behavioral Summary

Mark Edwarson is a very conscientious person, particularly attentive to, careful of, and accurate with the details involved in the job. Identifies problems, and enjoys solving them, particularly within own area of expertise.

Reserved, serious, and always concerned with the exact correctness of the work. Self-discipline, sense of duty, and respect for authority and tradition are strong qualities in Mark Edwarson, who takes responsibilities very seriously.
 

Employment History

PROJECT ENGINEER

Industry:

Construction / Building / Engineering

Employment Period:

January 2017 to June 2017 (4 Months)

Duties and Responsibilities:

  • Perform engineering duties in planning and designing tools, engines, machines and other mechanically functioning equipment.
  • Oversee installation, operation, maintenance, and repair of equipment such as centralized heat, gas, water, and steam systems.
  • Read and interpret technical blueprints, technical drawings, schematics and computer-generated reports, confer with engineers and other personnel to implement operating procedures, resolve system malfunctions, and provide technical information.
  • Research and analyze customer design proposals, specifications, manuals and other data to evaluate feasibility, cost, and maintenance requirements of design applications.
  • Specify system components or direct modification of products to ensure conformance with engineering design and performance specifications.
  • Managing projects using engineering principles and techniques.
  • Preparing product and project reports and documentations.

MECHANICAL DESIGN ENGINEER

Industry:

Construction / Building / Engineering

Employment Period:

June 2017 to July 2020 (37 Months)

Duties and Responsibilities:

  • Performed space planning, calculations (cooling load, mechanical ventilation, indoor air quality, smoke extraction, stairwell pressurization, fireman’s lift pressurization and etc.) and layout of mechanical plans (equipment and layout configurations, duct works, refrigerant and chilled water piping layout and other mechanical details),
  • Was part of 
  • Ensured all work is in compliance with applicable codes and standards (ASHRAE 62.1, ASHRAE 90.1, NFPA 92, SMACNA and other local codes),
  • Attended technical and coordination meetings internal and external as needed by the company,
  • Prepared design criteria and equipment technical specification,
  • Reviewed and evaluated all submittals (quote and technical documentation of equipment proposal submitted by contractors),
  • Supported other trades(architectural, structural, electrical, fire protection, plumbing and sanitary) in execution of plans to meet.
  • Contributed to office projects and commercial fitouts, including high-rise offices, malls, restaurants, and residential spaces. Successfully assessed technical specifications for various office projects in Australia, selecting suitable equipment to meet cooling requirements. changing needs and requirements.

Mechanical Engineer

Industry:

Consulting (Business & Management)

Employment Period:

August 2020 to November 2023 (38 Months)

Duties and Responsibilities:

  • Provides engineering support for the following product offers: (Precision Cooling, Packaged HVAC systems, precision chillers, data center mechanical infrastructure and Containment systems).
  • Performs pipe sizing, duct designing, system selection. Managing tender schedule and review tender documents such as technical specifications, drawings, schedules & etc.
  • Prepares complete technical product selections. Generate quotations. Prepares complete compliance report. Provides technical support to clients and provide solutions to their cooling requirements.
  • Coordinate with the BDMs for project status and updates.

Education History

Field of Study:

Engineering (Mechanical)

Major:

Mechanical Engineering

Graduation Date:

April 4, 2016

Located In:

Philippines

License and Certification: :

Mechanical Engineer Licensure Exam


Skills

ADVANCED ★★★

    Mechanical Engineering, AutoCAD, Analytical Skills, Clerical Skills, Microsoft Office, 2D Design, Microsoft Excel, Material Cost Estimation,

INTERMEDIATE ★★

    Communication Skills, Critical Thinking, Listening SkillsClient PresentationsResearchCost Engineering3D Design

Work at Home Capabilities:

  • Internet Bandwidth: Greater than 100mbps
  • Working Environment: Private Room
  • Speed Test Result: https://www.speedtest.net/result/16317751192
  • Internet Type: Fiber
  • Hardware Type: Laptop
  • Brand Name: Asus TUF F15
  • Processor: 11th Gen Intel(R) Core(TM) i5-11400H @ 2.70GHz 2.69 GHz
  • Operating System: Windows 11

All-inclusive Rate: USD $10.03/hr

Cristina

Candidate ID: 395839


ADVANCED

    AutoCAD, Material Cost Estimation, Quantity Surveying...

INTERMEDIATE

    BlueBream...

Employment Preferences

Availability:
Part Time Full Time
Preferred Timezone:
Australian Central Standard Time
Hourly & Monthly Rate:
(inclusive of service fee)

*Plus GST for Australian Businesses

Part Time: $USD 10.03 per hour or $USD 868.85 per month

Full Time: $USD 10.03 per hour or $USD 1737.69 per month

Remote Staff Recruiter Comments

  • Cristina has been working for more than 10 years as a Quantity Surveyor/Estimator. She has a degree in Civil Engineering,
  • She estimates and evaluates the materials needed for the project. She reviews and prepares quotations for pre and post-construction plans. She does daily reports, Job Order and Evaluate Client to Owner Change orders. She has experience with Residential, Commercial, Architectural and Construction Projects. She has background in Waterproofing way back 2017.She is knowledgeable in AU building codes, regulations, and construction practices
  • She used the following softwares"
    • Bluebeam Revu
    • V-6 Software
    • e-take off
    • Microsoft Excel
    • Microsoft Dynamic 365
    • Smartbid
  • She can Start ASAP  for Full time and part time positions
Predictive Index Behavioral Profile - Guardian 

Strongest Behavior
  • Detail-oriented and thorough; works to ensure things don’t fall through the cracks, and follows up to ensure they’re done properly and on time.
  • Teaches and shares; often working collaboratively with others to help in any capacity.
  • Accommodating; most comfortable working with others, often puts team/company goals before personal goals. Promotes teamwork by actively sharing authority.
Behavioral Summary
 

Cristina is a very conscientious and disciplined person; particularly careful, thorough, and accurate in their work. She is exacting and strives to produce results that precisely meet the established goals. Works best where there are clear standards, expectations, reporting relationships and measurements for the work. Cristina will depend upon professional training, their own experience, or management leadership, to provide those standards and the structure needed for their work.

Given sufficient experience, She will produce work of high quality, giving close attention to the accuracy of details. She is stable and dependable; consistent in their actions and, if necessary, has sufficient patience to do work of a repetitive nature. She believes in having, and following, well-defined processes and procedures.


 

Employment History

Material Estimator

Industry:

Construction / Building / Engineering

Employment Period:

March 2021 to January 2023 (22 Months)

Duties and Responsibilities:

  • Estimates materials needed in the project using e-take off software, Bluebeam Revu
  • Seek materials quotations from suppliers during pre and post tender
  • Contact Subcontractors to follow up and discuss the scope of works
  • Invites Subcontractors to bid using SmartBid Software

Estimator / Coordinator (Homebased)

Industry:

Construction / Building / Engineering

Employment Period:

June 2016 to March 2020 (45 Months)

Duties and Responsibilities:

  • Estimates components of Windows and Doors, including frames, glazing, and other accessories using V6 Software
  • Prepares daily report of accomplishments for Quotes done in a day

Estimator

Industry:

Construction / Building / Engineering

Employment Period:

August 2014 to September 2015 (13 Months)

Duties and Responsibilities:

  • Estimates components of Kitchen Cabinets and other Joinery works 

Quantity Surveyor

Industry:

Construction / Building / Engineering

Employment Period:

February 2013 to July 2014 (17 Months)

Duties and Responsibilities:

  • Estimate, and evaluates the request for materials from the site.
  • Monitors and controls materials consumed on-site
  • Prepares Job Orders prior to mobilization of work on site
  • Evaluates Subcontractors Billing
  • Estimates Claims to Owner (Change Orders)

Quantity Surveyor

Industry:

Construction / Building / Engineering

Employment Period:

April 2011 to October 2012 (18 Months)

Duties and Responsibilities:

  • Review and Evaluate Construction Technical Inquiry (CTI) with regards to work impact
  • Check actual situation and progress on site
  • Quantify weekly updates of accomplished work at the site
  • Coordinating with another department with regard to work-related issues
  • Estimates Claims to Owner (Change Orders)
  • Gathering information and investigating Subcontractors' back charges

Office Engineer

Industry:

Construction / Building / Engineering

Employment Period:

January 2009 to March 2011 (25 Months)

Duties and Responsibilities:

  • Prepares Contractor’s Billing for Claim to the Owner, Evaluation of Subcontractors billing
  • Prepares daily activity reports and Monthly Accomplishment Reports at the site
  • Estimates and costing of Variation Orders and Additional Works

Junior Quantity Surveyor

Industry:

Construction / Building / Engineering

Employment Period:

January 2007 to November 2008 (22 Months)

Duties and Responsibilities:

  • Coordinate with Owner, Architect, Designers/ Engineers, and Contractors
  • Prepare Budgetary Costs for Civil, Structural, and Architectural Works
  • Attend Site Inspection, Pre-bid Conference, Clarification and Negotiation Meeting
  • Seek Client/ Architect’s clarification on Technical and Commercial Issues and Coordinate with Contractors
  • Review and Evaluate tender deliverables from Contractors, Variation Orders
  • Prepare Cost Comparison of Bids and make necessary recommendations
  • Acquire quotations for Owner Furnished Materials

Project Engineer

Industry:

Construction / Building / Engineering

Employment Period:

October 2006 to December 2006 (2 Months)

Duties and Responsibilities:

  • ​​​​Supervision of workers
  • Prepares weekly accomplishments and payroll

Sales Engineer

Industry:

Heavy Industrial / Machinery / Equipment

Employment Period:

July 2006 to October 2006 (3 Months)

Duties and Responsibilities:

  • ​​​​​​Markets ceiling materials particularly Gypsum Boards & Acoustic Boards. Conducts Product Demo

Estimator

Industry:

Construction / Building / Engineering

Employment Period:

May 2023 to September 2023 (3 Months)

Duties and Responsibilities:

  • Reviewed project plans, blueprints, specifications, and other documentation to understand the scope and requirements of a project.
  • Identifed and quantifed the cost of materials, labor, and equipment required to complete the project.
  • Worked with vendors and suppliers to obtain quotes and pricing information.
  • Developed accurate and detailed estimates for the project.
  • Collaborated with project managers, engineers, architects, and other stakeholders to ensure that the estimate is comprehensive and accurate.
  • Prepared and submit bid proposals to clients.
  • Negotiated pricing and contracts with vendors and suppliers.
  • Monitored and track project costs to ensure that they remain within budget.
  • Provided support to project managers and other team members as needed.

Education History

Field of Study:

Engineering (Civil)

Major:

Civil Engineering

Graduation Date:

October 24, 2005

Located In:

Philippines

License and Certification: :

N/A


Skills

ADVANCED ★★★

    AutoCAD, Material Cost Estimation, Quantity Surveying,

INTERMEDIATE ★★

    BlueBream

Work at Home Capabilities:

  • Internet Bandwidth: 25 Mbps
  • Working Environment: Private Room
  • Speed Test Result: PING ms 6 DOWNLOAD Mbps 23.19 UPLOAD Mbps 23.60
  • Internet Type: Fiber
  • Hardware Type: Laptop
  • Brand Name: HP
  • Processor: AMD Ryzen 5
  • Operating System: Windows 10

All-inclusive Rate: USD $10.31/hr

Maricor

Candidate ID: 368817


ADVANCED

    2D, 2D Design, 3D, 3D Design...

INTERMEDIATE

    2D Modeling, 3D Modeling, 3D Printing...

Employment Preferences

Availability:
Full Time
Preferred Timezone:
Australian Western Standard Time Australian Central Standard Time Australian Eastern Standard Time
Hourly & Monthly Rate:
(inclusive of service fee)

*Plus GST for Australian Businesses

Full Time: $USD 10.31 per hour or $USD 1786.44 per month

Remote Staff Recruiter Comments

  • She is a Design Engineer with more than Sixteen (16) years of experience in the Manufacturing Industry.
  • She has expertise in equipment, fixtures and molds CAD and 3D Designs.
  • She is a project lead wherein she is involved in the following:
    • Coordinating with the clients for requirements.
    • Product Costing and estimation
    • Design and creating mock up
    • 3D Modelling and Fabrication
    • She also supported installation of the actual product.
  • She has expertise in using Autodesk Inventor and AutoCAD Mechanical.
  • She also has experience in using Vision PC which is a Japanese software for CAD.  
  • She can start after 2 weeks.

Employment History

Tool and Die Designer

Industry:

Manufacturing / Production

Employment Period:

January 2005 to February 2009 (49 Months)

Duties and Responsibilities:

  • Construct metal forms that are used to shape metal in stamping and forging operations.  
  • Responsible in making modifications, verifications of drawings and jig designs.

Office Stafd

Industry:

Government / Defence

Employment Period:

June 2009 to December 2009 (6 Months)

Duties and Responsibilities:

  • Assists evaluate school programs of different courses for Tesda accreditation.
  • Encode and update integrated data base for trainers. 

Press Metal Stamping Designer

Industry:

Manufacturing / Production

Employment Period:

January 2010 to July 2012 (30 Months)

Duties and Responsibilities:

  • Designing and developing manufacturing processes for enhancements, product changes, and new products, related fixtures and tooling that are consistent with zero defect level and low product cost. 

Design Engineer

Industry:

Manufacturing / Production

Employment Period:

August 2012 to November 2020 (99 Months)

Duties and Responsibilities:

  • Develops stainless kitchen equipment designs, engineering mockups, and offer kitchen equipment solutions for customers.
  • Provide detailed and accurate cost estimates for new /existing products.  
  • Handles major projects of McDonalds and Burger King Philippines.
  • Support international account, intercompany projects.

R&D Designer

Industry:

Manufacturing / Production

Employment Period:

January 2024 to Present

Duties and Responsibilities:

  • Research, Design and evaluate materials, assemblies and processes
  • Suggest training tools to enhance manufacturing performance.

Education History

Field of Study:

Engineering (Computer/Telecommunication)

Major:

Electronic and Communication Engineering

Graduation Date:

October 1, 2004

Located In:

Philippines

License and Certification: :

N/A


Skills

ADVANCED ★★★

    2D, 2D Design, 3D, 3D Design,

INTERMEDIATE ★★

    2D Modeling3D Modeling3D Printing

Work at Home Capabilities:

  • Internet Bandwidth: 25 Mbps
  • Working Environment: Private Room
  • Speed Test Result:
  • Internet Type: Fiber
  • Hardware Type: Laptop
  • Brand Name: Asus
  • Processor: i3 7th Gen
  • Operating System: Windows 10

All-inclusive Rate: USD $11.24/hr

Johnquil

Candidate ID: 342793


ADVANCED

    AutoCAD, Technical Documentation, Project Management, People Management...

INTERMEDIATE

    Instrument Calibration, Microsoft Visio...

Employment Preferences

Availability:
Full Time Part Time
Preferred Timezone:
Australian Western Standard Time Australian Central Standard Time Australian Eastern Standard Time New Zealand Daylight Time Hawaii Standard Time Alaska Standard Time US Pacific Standard Time US Mountain Standard Time US Central Standard Time US Eastern Standard Time UK London
Hourly & Monthly Rate:
(inclusive of service fee)

*Plus GST for Australian Businesses

Part Time: $USD 9.37 per hour or $USD 811.98 per month

Full Time: $USD 11.24 per hour or $USD 1948.91 per month

Remote Staff Recruiter Comments

  • John has 14 years of experience comprised of different role in the industrial sector but aligned with Industrial Automation and Process Instrumentation. 9 years of that experience came from manufacturing companies having different positions in engineering department doing maintenance, repairs, and project implementation and  process improvement. Then the rest of his experience came 
    from designing companies and system integration companies that deals with different projects around the world.
  • Proficient in the following:
    • Troubleshooting and Repair 
    • Project Management and People Management
    • PLC/HMI Programming (handled Allen Bradley, Siemens and Omron products)
    • CAD (Panel and Wiring Diagram)
    • Process and Procedure Development 
    • Calibration 
    • Software Development Design
  • Has worked for an Australian electrical and electronics company where he designed automation control systems.
  • Available to start immediately.

Predictive Index Behavioral Profile - Individualist

Strongest Behaviors
  • Persistence; consistent pursuit of goals in calm, methodical manner even when setbacks occur. Opinionated; slow to change.
  • Casual with rules. Focused on the goal, not how to get there; willing to bend the rules. Delegates implementation details.
  • Unworried and unhurried; takes each day as it comes with little planning for what might happen, particularly given the predictable routines that have been established.
Behavioral Summary

Johnquil is independent and individualistic in thinking and behavior. Has strong ideas and opinions and expresses them with confidence and certainty.

Having a willingness to take risk, this individual is likely to develop and act on ideas that are distinctly new or unconventional. This is a creative and nonconformist personality.

In expressing and acting on their ideas, this individual is determined and persistent and has the kind of confidence and nerve involved in initiating innovation or change. Very determined and persistent, once a goal is set they’ll generally push hard to reach it, regardless of the goal’s popularity with others. Undaunted by criticisms or failures.


Employment History

HEAD OF AUTOMATION

Industry:

Employment Period:

February 2019 to August 2020 (18 Months)

Duties and Responsibilities:

  • Spearhead Automation Projects and act as Project Manager.
  • Provide technical support for the clients in SEAA Region.
  • Manage all activities of Automation Department and make sure all activities are distributed accordingly.
  • Act also as the Business Development for the Philippines. To acquire projects in the Philippines and to create opportunities in terms of Automation.
  • Develop partnerships with Automation OEMs and support them on their internal projects.
  • We do projects in Different Industries from Manufacturing and Grains Processing. We cater Process and Equipment optimization from Material Handling up to Product Packaging.
  • We provide different types of Automation and MES solutions to different Industries according to their need and resources.
PROJECTS: 
  • SCADA and Controls Integration - PT Golden Gran Mills, Indonesia 
    • Replace existing Centralized Control System and SCADA of the plant with a new System based on Functional Description. 
    • Install new Control Panels that includes new PLC and VFD for the controls of the conveyors and sifter. 
  • Plant Integration System - Golden Bay Grand Terminal, Batangas, Philippines 
    • Integrate new conveyor system that integrating 2 Plant with modification on its safety protocol. 
    • Modify SCADA system base on the additional conveyors added to the plant w/out affecting the interlocks of the process. 
  • MCC Installation and VFD Integration - Citigroup, Bangladesh 
    • Replace existing MCC with new VFD installed for the conveyor and sifters. 
    • Modify existing Control System for the variables and parameters need to the new installed VFDs. 
  • Waste Water SCADA System - Intermalt, Vietnam 
    • install new Control System for their waste water base on the Functional Description of the end user. 
    • Modify P&ID base on the changes that clients need.

INSTRUMENTATION AND CONTROL SUPERVISOR

Industry:

Manufacturing / Production

Employment Period:

June 2013 to February 2019 (67 Months)

Duties and Responsibilities:

  • Lead the Instrumentation & Control Group in maintenance of all equipment in the plant.
  • Lead the group in troubleshooting, repair and monitoring of all equipment specially those automated related equipment like Motor Controls, Servo motors and drives, VFD, Instruments, PLC, HMI / SCADA, Measuring, Metering and Controlling Devices, Pneumatics / Electro-Pneumatic devices and other similar devices in the process and utilities equipment.
  • Responsible on all Instrumentation and Automation projects in the plant.
  • Responsible on spare parts management and safety process of the plant. P
  • Participate on every HAZOP and HACCP as representative and Team Leader of Instrumentation and Control Team.
  • Participate on the review of the P&ID used in the plant for the Process Control and Instrumentation side.
  • Responsible for Training and development of technicians in the plant.
  • Perform as Factory Leader and help the whole company achieving its Yearly Performance by supporting all WCM targets and KPIs .
PROJECTS: 
  • Plant Capacity Expansion Project 
    • Relocate equipment and install additional production lines for the capacity expansion. 
    • Prepare drawing layout of all the equipment and conveyors that will be moved and install based on actual dimensions. 
    • Evaluate designs of the conveyors system. 
    • Evaluate every Control System that will be used in the project based on PFD, P&ID and Functional Description that been prepared before implementation. 
    • Installations includes 2 New RUF Machine, Big Drum Cone Line with Kuka Robot for Packaging, 2 Hardening Tunnel, 10 Ageing Tanks, 1 New Conveyor system for 4 Production Lines and Instrumentation & Controls from Mix Plant to Packaging Area. 
    • Relocation of Flexline Tub Filling Line, Versaline Stick Filling Line, and RUF Tubline Machine including their corresponding conveyor system. 
    • Installation of X-ray Machines, Carton Formers and Check weigher for each conveyor system corresponding to each filling lines need.
  • Process Integration for Rocket Jelly Product 
    • Integrate additional Accessory Equipment such as Conveyors, Choco tanks, Steam line, and Conversion kits (End Seal, Fin Seal and Wrapper Folding Box for packaging and Ice Cream Molds). 
    • Assess accessory equipment`s floor layout and install it w/out affecting existing process of the production line. 
  • Ice Cream Mix Match Project 
    • Automating the monitoring of the mixes and controlling the pump to reduce Ice Cream Mix waste. 
  • Ammonia Plant SCADA and Instrumentation 
    • Installation of New Instruments to the plant. Replacing old/malfunctioned instrument base on functions needed for the automation. 
    • Integration of all equipment in the Ammonia Plant for Monitoring and Minor Controls. 
  • Cone and Tub Line Controls Upgrade 
    • Upgrading of Control System and Mechanical Stations of the Ice Cream Filling Line for Cone and Tubs. 
    • Replace and Install New Conveyor System for the Filling lines to the Hardening Tunnel base on the layout that we prepare. 
  • Cone Vision System
    • Install Vision System and Integrate it to the Machine`s reject system for cone packaging quality. 
  • Mix Plant Control System Upgrade 
    • Upgrade existing Hardware setup for PLC-CPU to Redundancy setup. 
    • Upgrade existing SCADA system and includes additional  instruments and other equipment added to the Mix Plant process.

ELECTRICAL & INSTRUMENTATION ENGINEER

Industry:

Heavy Industrial / Machinery / Equipment

Employment Period:

June 2010 to June 2013 (35 Months)

Duties and Responsibilities:

  • Act as Instrumentation Design Engineer for some of the projects and Lead Control System Engineer at the same time.
  • Manage project deliverables and designate it to respective engineers for their work with accordance to Project timeline. Identify and dictate right control system for each project.
  • Design and prepare all Instrumentation Control Systems deliverables such as P&ID, HAZOP Plan, Instrument Hook-up Diagram, Control System Block Diagram,  functional Description, Schematic Diagram, Sequence Logic Diagrams, System Control & Interlocks Schedule, Pneumatics & Hydraulic Control Schematic, System Architecture and other Instrumentation & Control Systems Deliverables.
  • Provide troubleshooting assistance to site operation and proper solution.
  • In-charge with the development of Automation System for every equipment and solutions
PROJECTS:
  • Blayney Filter Machine Integration - New Crest Mining - Orange County, NSW, Australia 
    • Integrate manufactured Filtration Machine to their existing control system. 
  • Filter Machine Integration - Maeden Alumina Mining – Saudi Arabia 
    • Install and Integrate 3 manufactured Filtration Machine to their  existing control system. 
  • GE Turbine Skid Module, Controls and Instrumentation  - Clients from Belgium, China, Australia, Malaysia, New Zealand and Middle East Countries. 
    • Install instruments and control system base on clients different Functional Description of the Skid.

AUTOMATION ENGINEER

Industry:

Employment Period:

February 2009 to June 2009 (4 Months)

Duties and Responsibilities:

  • Develop and Edit PLC and SCADA/HMI programs.
  • Commission and Implement project including preparation of all documents for every project.
  • Provide any kind of Technical Support on different Industries.
PROJECTS: 
  • Diverter and Packaging Upgrade Project for Cracker Line 
    • Install additional conveyor and modify pathway by using diverter system for Cracker Line Rejection System. 
    • Modify packaging parameters to attain good finish product. 
  • Wyeth Dryer Monitoring System
    • Install and Modify Product Monitoring for their barcode system. 
  • PLC Maintenance 
    • Perform Preventive Maintenance activity to their control system and do backup of their current PLC program. 
    • Modify program base on the end-user preference parameters.

DESIGN ENGINEER

Industry:

Employment Period:

December 2008 to January 2009 (1 Months)

Duties and Responsibilities:

  • Design Panel Diagram using Autocad Software
  • Design Wiring Diagram “Point to Point” and “Detailed”.
  • Modification of P&ID
  • Prepare all Instrumentation & Control documents and drawings needed by senior engineers.
PROJECTS: 
  • Nansemond Waste Water Control System - New York, USA 
    • Design Control System wiring diagram and Instrument hook-up  diagram. 
  • Croton H Control System - New York, USA 
    • Design Control System wiring diagram and Instrument hook-up diagram.

MAINTENANCE COORDINATOR

Industry:

Manufacturing / Production

Employment Period:

December 2007 to August 2008 (8 Months)

Duties and Responsibilities:

  • Manage technicians and engineers on repair and troubleshooting.
  • Responsible for manpower schedule for Maintenance and Work Order.
  • Implement Project Study new machines, projects, or renovations.
  • Prepare and manage documents for Engineering Department and enhance old guidelines and procedures existing in the department.

MEE SUSTAINING TECHNICIAN

Industry:

Semiconductor / Wafer Fabrication

Employment Period:

January 2006 to July 2007 (18 Months)

Duties and Responsibilities:

  • Responsible for all issues encountered on Singulation Station.
  • Create a program used for new product on Singulation Station.
  • Responsible for buy-off of machine and new product on Singulation Station. Also Responsible for new product innovation in the department.
  • Build and implement Skill Test and training module for technicians that will be assigned to Singulation Station.

MEE SUSTAINING TECHNICIAN

Industry:

Semiconductor / Wafer Fabrication

Employment Period:

August 2005 to January 2006 (4 Months)

Duties and Responsibilities:

  • Maintain, troubleshoot and repair all equipment in End of Line production area including Auto Frame Loader robot sequence programming.
  • Also Responsible for the ESD grounding of working tables, machines, and other equipment being used in production.
  • Responsible for wiring installation of machines during relocation.

Project Consultant

Industry:

Consulting (IT / Science / Engineering & Technical)

Employment Period:

September 2022 to July 2025 (34 Months)

Duties and Responsibilities:

  • Implement OT Cybersecurity program to the assigned company and provide proper documentation for the said program.

Country Manager (Managing Director)

Industry:

Consulting (IT / Science / Engineering & Technical)

Employment Period:

September 2024 to August 2025 (10 Months)

Duties and Responsibilities:

  • I managed the whole company in the Philippines for Operation and support to other affiliated companies worldwide.

Education History

Field of Study:

Engineering (Others)

Major:

Instrumentation Technology

Graduation Date:

October 19, 2005

Located In:

Philippines

License and Certification: :

Certified Instrumentation and Control Technician


Skills

ADVANCED ★★★

    AutoCAD, Technical Documentation, Project Management, People Management, Engineering, PLC Programming,

INTERMEDIATE ★★

    Instrument CalibrationMicrosoft Visio

Work at Home Capabilities:

  • Internet Bandwidth: Greater than 100mbps
  • Working Environment: Private Room
  • Speed Test Result: N/A
  • Internet Type: Fiber
  • Hardware Type: Laptop
  • Brand Name: Macbook Pro
  • Processor: M3 Pro Chip
  • Operating System: MacOS X

All-inclusive Rate: USD $8.43/hr

Edward

Candidate ID: 313437


ADVANCED

    ...

INTERMEDIATE

    Computer Hardware, Computer Literacy, Adobe Acrobat, Computer Troubleshooting...

Employment Preferences

Availability:
Full Time
Preferred Timezone:
Australian Eastern Standard Time Australian Central Standard Time Australian Western Standard Time
Hourly & Monthly Rate:
(inclusive of service fee)

*Plus GST for Australian Businesses

Full Time: $USD 8.43 per hour or $USD 1461.50 per month

Remote Staff Recruiter Comments

  • Edward worked for over 20 years, earning a degree in Electrical Engineering. 
  • He had pieces of training on:
    • Autodesk AutoCAD
    • Programmable Logic Control
    • Sensor Technology Dualtech
    • Electro-Pneumatics Automation
    • Basic Pneumatics Automation
  • He prepared a bill of quantities and design drawings for approval of estimated costs for Construction materials, equipment, devices and labor costs.  He attends bid meeting and coordination with clients on projects. He prepares, understands and interprets construction plans, cost estimates, specifications and other contract documents for proper implementation. He prepared quotations from tender documents and generated quotations from price lists. He reviewed the bid documents for electrical and auxiliary layout plans and material specifications. He estimated all the required electrical and auxiliary works. He designed and estimated Electrical and Auxillary systems which included single-line diagrams and layout drawings. He checks for compliance with the requirements of the electrical works, materials, fixtures, equipment and methodologies 
  • He is proficient in using
    • AutoCAD
    • Autodesk 2D
  • He can start ASAP and is open for full time position
Predictive Index Behavioral Profile - Specialist 

Strongest Behavior
  • Driven to protect the company against risk by thoroughly leveraging their background and strictly following “the book.”
  • Cautious; follows a well-established and proven plan to avoid making mistakes. Does the background research necessary to have proof to support decisions before action is taken.
  • Detail-oriented and accommodating; most comfortable working as part of a well-defined team for which they produce high-quality output and decisions.
Behavioral Summary

Edward is a very conscientious person, particularly attentive to, careful of, and accurate with the details involved in the job. Identifies problems, and enjoys solving them, particularly within own area of expertise.

Reserved, serious, and always concerned with the exact correctness of the work. Self-discipline, sense of duty, and respect for authority and tradition are strong qualities in Edward, who takes responsibilities very seriously.

With experience and/or training, Edward will develop a high level of specialized expertise and efficiency. Disciplined and dedicated to the job and the company. Work pace is somewhat faster-than-average, and Edward is motivated by a real concern for getting work done on time and correctly. Discipline and circumspect thinking will lend caution to decision-making; plans ahead, double checks, and follows up carefully on decisions and actions.


 

Employment History

Electrical Estimator (Sales Support)

Industry:

Consulting (Business & Management)

Employment Period:

April 2018 to December 2023 (67 Months)

Duties and Responsibilities:

• Preparing quotations from tender documents.
• Going through tender documents to confirm compliance, product selection.
• Generate quotation from price lists.
• Manage tender schedule and going through tender documents to confirm compliance product selection.
• Preparing quotations received from email for live projects.
• Preparing mechanical specification compliance report.
• Generate VSD price lists per specific customer.
• Preparing Project Delivery Sheet Schedule.
• Generate Tender Sheet Schedule for project monitoring purposes.
• Forwarding purchased orders and quotes to customer service sales for processing.
• Teaching newly hired electrical estimators.

Electrical Estimator (Supervisory Level)

Industry:

Construction / Building / Engineering

Employment Period:

July 2014 to October 2017 (39 Months)

Duties and Responsibilities:

• Review the bid documents which include electrical and auxiliary layout plans and material specifications.
• Estimate all the required electrical and auxiliary works of the project then prepare Bill of Quantities which includes labor and material costs.
• Prepare Request for Quotation to be sent to suppliers to determine the price of estimated materials based on design.
• Follow-up and accumulates different suppliers’ quotations for comparison of prices which will determine the best possible price considering budget cost but not suffering quality.
• Also prepare electrical and auxiliary drawing layout plans if there are any changes or modifications in the most recent updated architectural plans.
• Attend site inspections if there is new project for bidding, or for renovations, modifications, demolitions, dismantling and re-installation, etc., of electrical works.
• Supervise electrical sub-contractor for the implementation of the project.
• Perform related duties and responsibilities as assigned

Electrical Engineer

Industry:

Electrical & Electronics

Employment Period:

June 2008 to August 2013 (62 Months)

Duties and Responsibilities:

• Review the bid documents which include plans and material specifications of the project required in design.
• Design and estimate Electrical and Auxiliary System which includes Single Line or Riser Diagram, Layout Drawing and estimated material take-off.
• Make an Estimate Sheet Summary and Scope of Works.
• Prepare the estimated material take-off in preparation for the Bill of Quantities that were itemized per system.
• Prepare Request for Quotation to be sent to suppliers to determine the price of estimated materials based on design.
• Follow-up and accumulates different suppliers’ quotations for comparison of prices which will determine the best possible price considering budget cost but not suffering quality.
• Prepare an arch file which compose of technical specs, bid documents, drawings, take-off & estimate sheets, request for quotations, and supplier’s quotation – for record keeping and future reference.
• Prepare bill of quantities and design drawings to be presented to engineering managers for approval of estimated costs which may include construction materials, equipment, devices, and labor costs.
• Attend bid meeting with the client for the coordination of the project.

Electrical Engineer

Industry:

Manufacturing / Production

Employment Period:

March 2007 to June 2008 (15 Months)

Duties and Responsibilities:

• Check for compliance the submittal requirements of electrical works’ materials, fixtures, equipment and methodologies prior to delivery of materials. Checks the materials delivered and its workmanship. Reports any deviation or seemed contrary to the plans and specifications as against any accepted engineering standards taking into consideration the interest of the Client in terms of quality, economy and time.
• Prepares, understands and interprets engineering construction plans, cost estimates, specifications and other contract documents for proper implementation.
• Ensure compliance to the requirements through close physical inspection during the execution of the project and installation of equipment and materials by the Contractor. Records and issues corresponding memorandum for non-conforming works to effect appropriate rectification/corrective measures.
• Assist in the preparation of progress reports of electrical works in the project. Prepares necessary correspondence, daily inspection report and punch lists. Maintain records of changes and field notes. Prepare recommendations on approval of progress payments and change orders.
• Perform related duties and responsibilities as assigned

Manufacturing Technician—Equipment

Industry:

Computer / Information Technology (Software)

Employment Period:

June 1997 to October 2006 (112 Months)

Duties and Responsibilities:

• Directly responsible for the repair & troubleshooting of test equipment.
• Conduct equipment audit.
• Make daily report.
• Help implement projects for the improvement of machine utilization with regards to productivity, quality, and human safety

Process Engineer

Industry:

Semiconductor / Wafer Fabrication

Employment Period:

February 1994 to July 1997 (41 Months)

Duties and Responsibilities:

• Perform operations of Engineering Run units before running actual production.
• Study the status of equipment performance in relation to the product that was being process therein.
• Make documents on how the process flow was done in the product.
• Solve problems encountered during operation.

Lightman-Electrician

Industry:

Government / Defence

Employment Period:

January 1992 to July 1992 (6 Months)

Duties and Responsibilities:

• Provide lights and electrical power supply for video camera to be used during live coverage speech of his/her Excellency—The President of the Philippines.

Education History

Field of Study:

Engineering (Electrical/Electronic)

Major:

Electrical Engineering

Graduation Date:

March 29, 1991

Located In:

Philippines

License and Certification: :

N/A


Skills

ADVANCED ★★★

INTERMEDIATE ★★

    Computer Hardware, Computer Literacy, Adobe Acrobat, Computer Troubleshooting, Microsoft Excel, Microsoft Outlook, Microsoft PowerPointMicrosoft WordPlanSwiftAutoCADBluebeam Software

Work at Home Capabilities:

  • Internet Bandwidth: Greater than 100mbps
  • Working Environment: Shared Room
  • Speed Test Result: https://www.speedtest.net/result/15875683078
  • Internet Type: Fiber
  • Hardware Type: Desktop
  • Brand Name: HP
  • Processor: Intel core i5
  • Operating System: Windows 11

All-inclusive Rate: USD $11.71/hr

Christine

Candidate ID: 306907


ADVANCED

    Quantity Surveying, Material Cost Estimation, AutoCAD, PlanSwift...

INTERMEDIATE

    Architectural Design, SAP, Microsoft Office...

Employment Preferences

Availability:
Full Time Part Time
Preferred Timezone:
Australian Western Standard Time Australian Central Standard Time Australian Eastern Standard Time US Pacific Standard Time UK London
Hourly & Monthly Rate:
(inclusive of service fee)

*Plus GST for Australian Businesses

Part Time: $USD 11.24 per hour or $USD 974.45 per month

Full Time: $USD 11.71 per hour or $USD 2030.14 per month

Remote Staff Recruiter Comments

  • Christine has more than 8 years of experience as a Quantity Surveyor and Estimator. In her recent employment, they do fit outs for hotels and other commercial establishments. In here, she was doing estimation and material take off for cabinets, flooring and wall panelling. She is using Planswift software for estimation and take off preparation.
  • She is proficient in the following:
    • Quantity Surveying and Procurement
    • Preparing of the Cost Estimations, BOM and materials take off
    • Order processing from contacting the suppliers/contractors to checking of the materials
    • Reviewing of the contract, specifications,material take off and payoff quantity.
    • Analyzing the Plans and Checking the plans if it is being followed.
    • Quality assurance and quality control.
    • Preparing the daily report.
  • She is proficient in using tools/software like:
    • AutoCAD for design
    • Planswift for estimation
    • MS Office
  • She worked with industries like construction and Interior Fit Out provider.
  • With her most recent job she also handled projects that include Joinery.
  • She is a graduate of Civil Engineering and a board passer.
  • She has good English speaking skills.
  • A concern is that she will need 15-30 days notice prior to start.
Predictive Index Behavioral Profile - Scholar

Strongest Behavior
  • Formal, reserved, introspective, and skeptical of new people; requires “proof” to build trust in new people.
  • Detail-oriented and precise; follow-through is deep and literal to ensure tasks were completed in accordance with quality standards.
  • Operationally, as opposed to socially, focused. Thinks, in specific terms, about what needs to be done and how to do it accurately and flawlessly; follows, in a literal way, that execution plan.
Behavioral Summary

Christine Myr is a serious, introspective person and an analytical and disciplined thinker. Careful, thorough and very focused on their responsibilities.
She is reserved and will generally express herself in a factual, direct, and succinct manner. A conscientious person, their approach to the work is systematic, methodical, and well organized, based on thorough knowledge of, and respect for “the book”. Working with factual, technical or detailed information, she’ll produce carefully thought-out work of high quality and precision. Whether doing work herself, or delegating to others, follow up is close to ensure high-quality results.


Employment History

Procurement and Material Management Engineer

Industry:

Construction / Building / Engineering

Employment Period:

January 2015 to September 2015 (8 Months)

Duties and Responsibilities:

  • Analyze all suppliers in order to select the most suitable suppliers who are able to deliver high quality products at competitive pricing. 
  • Negotiate with suppliers on lead-time, cost and quality so as to obtain the maximum benefit for the company. 
  • Create monthly performance reviews and reports focusing on overall sourcing requirements.
  • Coordinate with vendor on continuous quality improvement.

Office/Site Civil Engineer

Industry:

Construction / Building / Engineering

Employment Period:

September 2015 to September 2016 (12 Months)

Duties and Responsibilities:

  • Managing, monitoring and interpreting the contract design documents supplie
  • Checking plans, drawings and quantities for accuracy of calculations.
  • Ensures that all materials used and works performed are as per specifications.
  • Overseeing quality control and health and safety matters on site.
  • Day-to-day management of the site, including supervising and monitoring the site labor force and the work of any subcontractors.

Quantity Surveyor

Industry:

Construction / Building / Engineering

Employment Period:

September 2016 to April 2020 (43 Months)

Duties and Responsibilities:

  • Prepare quantification for gross quantity of owner supplied materials for the project.
  • Reconciliation of quantity of material for purchase and delivery, with external quantity surveyor of the project.
  • Evaluates billing of sub-contractors based on actual accomplishment
  • Liaise with the Consultant Quantity Surveyor on contractual matters, progress claims and respective cost claims like VO.
  • Prepare material take off and bill of quantity.

Contracts Administrator

Industry:

Construction / Building / Engineering

Employment Period:

March 2023 to December 2024 (20 Months)

Duties and Responsibilities:

  • Liaise with parties involved in the construction contract by addressing, monitoring and risk controlling ensuring the contract is executed from design, tendering, construction, and final stage.
  • Review plans, specifications and contracts to ensure the correct equipment, material and subcontractor services are ordered and/or purchased
  • Prepare monthly project reports and make presentations at meetings
  • Support negotiations of claims, manage contractual changes, and resolve disputes or conflict resolution with Contractors
  • Assess and prepare claims from suppliers • Ensure project members use the contract correctly
  • Provide process recommendations to develop, improve contracts and management
  • Determine or negotiate contract terms and conditions, award supplier contracts or recommend contract awards
  • Manage paperwork related to contracts
  • Establish delivery schedules, monitor progress, and contact clients and suppliers to resolve problems
  • Work with project managers, architects, engineers, owners, and others to make sure project goals are met.

Contracts Administrator

Industry:

Consulting (IT / Science / Engineering & Technical)

Employment Period:

May 2020 to March 2023 (33 Months)

Duties and Responsibilities:

  • Pre-Award Management and Post award management of contracts.
  • Conduct Contract review and prepare necessary departures for negotiation.
  • Amend Construction contracts as what has been agreed upon during the negotiation part
  • Prepare necessary Notices and letters (Notice of Delay, Variation etc.) as per the Contract requirement.
  • Manage disputes and dispute resolution
  • Preparation of various claims
  • Preparation of Adjudication application and response. 

Estimator

Industry:

Consulting (IT / Science / Engineering & Technical)

Employment Period:

April 2018 to May 2020 (25 Months)

Duties and Responsibilities:

  • Reviewing construction plans and specifications to determine the type and amount of insulation material needed for the project.
  • Calculating the amount of insulation material needed for the project, taking into account factors such as the size of the building, the type of insulation material being used, and any special installation requirements.
  • Review, verify and complete JSA for the completed projects.

Senior Quantity Surveyor

Industry:

Construction / Building / Engineering

Employment Period:

September 2016 to May 2018 (20 Months)

Duties and Responsibilities:

  • Prepare quantification for gross quantity of owner-supplied materials for the project.
  • Reconciliation of quantity of material for purchase and delivery, with external quantity surveyor of the project.
  • Evaluates billing of sub-contractors based on actual accomplishment
  • Liaise with the Consultant Quantity Surveyor on contractual matters, progress claims and respective cost claims like VO.
  • Prepare material take-off and bill of quantity.

Education History

Field of Study:

Engineering (Civil)

Major:

Civil Engineering

Graduation Date:

March 1, 2014

Located In:

Philippines

License and Certification: :

Civil Engineering Board Examination


Skills

ADVANCED ★★★

    Quantity Surveying, Material Cost Estimation, AutoCAD, PlanSwift, STAAD, .NET 4.0,

INTERMEDIATE ★★

    Architectural DesignSAPMicrosoft Office

Work at Home Capabilities:

  • Internet Bandwidth: 25 Mbps
  • Working Environment: Private Room
  • Speed Test Result: https://www.speedtest.net/result/8039434316
  • Internet Type: Fiber
  • Hardware Type: Desktop
  • Brand Name: Customed
  • Processor: Intel Core i7
  • Operating System: Windows 10

All-inclusive Rate: USD $13.59/hr

Jorelle

Candidate ID: 284919


ADVANCED

    Mechanical Engineering, AutoCAD Mechanical, CAD, Drafting...

INTERMEDIATE

    ...

Employment Preferences

Availability:
Part Time Full Time
Preferred Timezone:
Australian Western Standard Time Australian Central Standard Time Australian Eastern Standard Time New Zealand Daylight Time
Hourly & Monthly Rate:
(inclusive of service fee)

*Plus GST for Australian Businesses

Part Time: $USD 13.59 per hour or $USD 1177.54 per month

Full Time: $USD 13.59 per hour or $USD 2355.08 per month

Remote Staff Recruiter Comments

  • Jorelle is a licensed Mechanical Engineer with over 15 years of industry experience, specializing in mechanical design, 3D CAD modeling, and the creation of detailed technical drawings.
  • He has worked extensively in the food manufacturing machinery industry, mining equipment design, audio electronics manufacturing, and power plant engineering sectors.
  • His academic background includes a Bachelor of Science in Mechanical Engineering from a reputable university in Manila, Philippines.
  • Throughout his career, he has contributed to diverse mechanical drafting and engineering projects, including the design and documentation of industrial food processing equipment, mining ventilation systems, and high-volume audio equipment components.
  • His work has involved the creation of comprehensive 3D models, part and assembly drawings, layout planning for shipping and installations, and preparation of technical manuals.
  • He has also provided design solutions to complex engineering problems, managed CAD libraries, and ensured project deliverables adhered to industry standards and client specifications.
  • He demonstrates strong proficiency in mechanical design and drafting, BOM preparation, and GD&T standards.
  • He is adept with multiple CAD platforms including Autodesk Inventor, AutoCAD, SolidWorks, and Creo Parametric.
  • He also has experience with Autodesk Vault for design data management.
  • His skillset supports high accuracy in technical documentation, efficient problem-solving, and collaborative project execution across multidisciplinary teams.
     

Employment History

Mechanical Draftsman

Industry:

Manufacturing / Production

Employment Period:

February 2024 to June 2025 (15 Months)

Duties and Responsibilities:

  • Create new or revise existing 3D models based on specifications provided by the Design Engineer or Project Manager
  • Create 3D models based on hand sketch or verbal instructions from the Design Engineers or Project Manager
  • Prepare Part detail, Weldment and Assembly drawings for fabrication
  • Ensure that the proper GD&T is specified on the Machining drawings and Weldment Drawings
  • Ensure that the BOM is complete and correct with the proper descriptions for smooth transitioning to Procurement
  • Prepare detailed assembly drawings using sections, exploded views and step by step procedures
  • Prepare Sales layout drawings to meet client’s requirements as instructed by the Sales Manager
  • Ensure that the Sales layout drawings conform with the PFD that the Sales Manager provided 
  • Prepare shipping layout drawings (Air Freight and Sea Freight) for easy packing for the production people
  • Prepare spare parts drawing Catalogue to be used for customer’s manuals 
  • Other duties provided by the Engineering Supervisor

Mechanical Draftsman

Industry:

Manufacturing / Production

Employment Period:

October 2020 to February 2024 (40 Months)

Duties and Responsibilities:

  • Create new or revise existing 3D models based on specifications provided by the Design Engineer or Project Manager
  • Create 3D models based on hand sketch or verbal instructions from the Design Engineers or Project Manager 
  • Prepare Part detail, Weldment and Assembly drawings for fabrication
  • Ensure that the proper GD&T is specified on the Machining drawings and Weldment Drawings
  • Ensure that the BOM is complete and correct with the proper descriptions for smooth transitioning to Procurement
  • Prepare detailed assembly drawings using sections, exploded views and step by step procedures
  • Prepare Sales layout drawings to meet client's requirements as instructed by the Sales Manager Ensure that the Sales layout drawings conform with the PFD that the Sales Manager provided
  • Prepare shipping layout drawings (Air Freight and Sea Freight) for easy packing for the production people 
  • Prepare spare parts drawing Catalogue to be used for customer's manuals
  • Other duties provided by the Engineering Supervisor

Mechanical Draftsman

Industry:

Mining

Employment Period:

January 2018 to January 2020 (24 Months)

Duties and Responsibilities:

  • Produce 3d Model that conforms with the applicable standard to be reviewed and approved by the Chief Engineer and Mechanical Engineers.
  • Produce Parts detail drawings, complete with BOM, GD&T, welding symbols, Surface treatment and finishes for fabrication
  • Produce Assembly drawings, General arrangement drawings and Site arrangement drawings for client reviews and approval
  • Provides a cost effective and adequate solution to some design problems when installing products on site.
  • Provides solution with regards to transporting products prior to testing, installation and commissioning.
  • Analyze engineering problems and propose corrective action and implement design improvement for developing models.
  • Issue the necessary design change notice and initiating the execution of the design change.
  • Manage the design data and competent libraries through the use of Autodesk Vault.
  • Create and/or Revised P&ID drawings for client's approval.
  • Assign Part numbers to every fabricated material and Purchased items for proper documentation.
  • Provide support to additional deliverable.

Engineer - Mechanics

Industry:

Construction / Building / Engineering

Employment Period:

January 2011 to January 2018 (84 Months)

Duties and Responsibilities:

  • Conceptualize design of professional audio equipment, musical instruments and their related products from its cosmetic appearance to its structure through coordination with Project Manager and achieving his requirements.
  • Design and provide Mechanical Part drawing and specifications for manufacturability and serviceability in a high-volume manufacturing environment.
  • Prepare and supply detailed assembly drawings with parts list, assembly information and product views and sections to support prototyping and product departments.
  • Prepare, check and ensure accuracy of Bill of Materials (BOM) and its structure.
  • Analyze engineering problems and propose corrective action and implement design improvement for developing models.
  • Issue the necessary design change notice and initiating the execution of the design change.
  • Manage the design data and competent libraries through the use of Autodesk Vault.
  • Provides complete 3D Assembly for product rendering.
  • Provides 2D Part drawings for reference in manufacturing purposes.
  • Provides complete 2D assembly drawings for reference in Production assembly side.
  • Through checking and making sure that every quantity update reflects on the BOM.

Engineer 1

Industry:

Construction / Building / Engineering

Employment Period:

January 2009 to January 2011 (24 Months)

Duties and Responsibilities:

  • Prepare Site and shop fabricated detail drawings and BOM of Boiler Non pressure parts equipment which are 2D drawings and 3D models using AutoCAD as my main tool in drafting. To be more specific, the fabricated non-pressure parts consist of the following:
    • Air and Gas ductworks
    • Air and Gas Ductworks Support
    • Air and Gas Duct Platform
    • Ductworks Attachments (Measuring Nozzle, Manhole, safety fence)
    • Buckstay Paneling CAD Modelling
  • Tools: Autodesk Inventor AutoCAD Creo Parametric SolidWorks Autodesk Vault

Education History

Field of Study:

Engineering (Mechanical)

Major:

Mechanical Engineering

Graduation Date:

March 28, 2008

Located In:

Philippines

License and Certification: :

N/A


Skills

ADVANCED ★★★

    Mechanical Engineering, AutoCAD Mechanical, CAD, Drafting, Autodesk Inventor, AutoCAD, SolidWorks, 3D Design, 3D Modeling,

INTERMEDIATE ★★


Work at Home Capabilities:

  • Internet Bandwidth: Greater than 100mbps
  • Working Environment: Private Room
  • Speed Test Result: N/A
  • Internet Type: Fiber
  • Hardware Type: Desktop
  • Brand Name: Aorus
  • Processor: i5-12600k
  • Operating System: Windows 10

*includes service fee. Please note that hourly rates are linked to the exchange rate, and fluctuate slightly from month to month.

**Please note that hourly rates are linked to the exchange rate and fluctuate slightly from month to month.