Candidate No. 487379
PLAY AUDIO
Ernesto Jr.

Business Service

Project Manager

Skills

★★★ Advanced:

Not Applicable, more

★★ Intermediate:

Not Applicable, more

Hourly Rate Gauge

Today's value  AUD $18.16

$15.88

if $ 1 = PHP 42

$20.27

if $ 1 = PHP 30
Currency Fluctuation Range

*includes service fee. Please note that hourly rates are linked to the exchange rate, and fluctuate slightly from month to month.

Employment Preferences

Availability:

 Full Time

Preferred Timezone:

Australian Eastern Standard Time, Australian Central Standard Time, Australian Western Standard Time

Hourly & Monthly Rate:
(inclusive of service fee)

Full Time: AUD $18.16 per hour or $3148.43 per month

*Plus GST for Australian Businesses
Remote Staff Recruiter Comments
  • Ernesto Jr has been working for 22 years in the construction Industry.
  • He is a registered Mechanical Engineer.
  • He is well-versed in Project and Construction Management for Installation, testing and commissioning of HVAC, Fuel, Gas, Irrigation, Domestic Water, Drainage, Fire protection and Mechanical Systems.
  • He was involved in different projects such as High rise Buildings, Commercial buildings, Power plant, hospitals, Industry and Refinary.
  • He has experience working with different clients such as Australian, from the middle east and others.
  • He used the following software:
    • AutoCAD
    • Revit
    • Elite Software
    • SAP
  • He can start after 2 weeks notice and he is open full time position.
Predictive Index Behavioral Profile - Specialist 

Strongest Behavior
  • Detail-oriented and precise; follow-through is deep and literal to ensure tasks were completed in accordance with quality standards.
  • Operationally, as opposed to socially, focused. Thinks, in specific terms, about what needs to be done and how to do it accurately and flawlessly; follows, in a literal way, that execution plan.
  • Careful with rules; precise, "by the book", fast-paced, and literal in interpreting rules, schedules and results.
Behavioral Summary

Ernesto is a very conscientious person, particularly attentive to, careful of, and accurate with the details involved in the job. He identifies problems, and enjoys solving them, particularly within own area of expertise.

He is reserved, serious, and always concerned with the exact correctness of the work. Self-discipline, sense of duty, and respect for authority and tradition are strong qualities in Ernesto, who takes responsibilities very seriously.

With experience and/or training, Ernesto will develop a high level of specialized expertise and efficiency. Disciplined and dedicated to the job and the company. Work pace is somewhat faster-than-average, and Ernesto is motivated by a real concern for getting work done on time and correctly. Discipline and circumspect thinking will lend caution to decision-making; plans ahead, double checks, and follows up carefully on decisions and actions.

Employment History
Project Engineer
Industry:Not ApplicableEmployment Period:February 2003 to March 2005 (25 Months)Duties and Responsibilities:Major Project Handled: 1200 MW Ilijan Combined Gas Cycle Power plant 314 San Roque Hydrothermal Power Plant 12 MW Nissin Monde Diesel Power Plant PETRON Bataan Hydrothreater Gas Extension project 112 Dingle Diesel Power Plant SunPower Semiconductors Job description summary: • Responsible for project execution for HOT OIL FLUSHING, • CHEMICAL CLEANING, HYDROJETTING, RETROJETTING, WATER FLUSHING for power plants ( combined gas cycle, hydro, diesel), petrochemical, ships, and general industries. • Exercising full control of work force at site, ensuring work is executed in accordance with the contract specification agreed procedure and method statement. Arrange for the material and necessary manpower in advance. • Preparation of method statements, material submittals, bill of quantities, project proposal and quotations. • Site surveying and setting out dimensional control. • General site management. • Ensures that safety rules and regulations are communicated to the workforce and are thoroughly enforced.
Applications Engineer
Industry:Not ApplicableEmployment Period:April 2001 to October 2002 (18 Months)Duties and Responsibilities:Applications Engineer HydroEnvirotech International Resources Corporation Makati, Philippines April 2001-October 2002:
Mechanical Engineer
Industry:Not ApplicableEmployment Period:April 2005 to April 2007 (24 Months)Duties and Responsibilities:( Fire Fighting & Plumbing) Project: DUBAI MARINA MALL & HOTEL/APARTMENTS Tower Manager Jumeirah Beach Residence Sector 05 Project ( a 37 flrs., Residencial Bldg.) April 2OO5- February 2007 Job Description: • Report directly to the Project Manager regarding the progress and issues of the project. • Manage & supervise the implementation in the construction of HVAC, Fire fighting, Plumbing, Sanitary & Electrical system. • Cost estimates materials, labor, other necessary contingencies as may be required. • Coordinate with the clients, sub-contractors and other people involve in the project. • Facilitate meetings with various sub-contractors regarding the condition, progress, or problems affecting the project. • Supervise, schedule, monitor the project. Worldwide Chemicals Inc., Makati, Philippines (a subsidiary of CETCO
GOLDEN PLANNERS CONSULTANT
Industry:Not ApplicableEmployment Period:April 2007 to October 2007 (6 Months)Duties and Responsibilities:UAE Project: Al Mushrif Gardens, Abu Dhabi
Quality Assurance/Quality Control Engineer
Industry:Not ApplicableEmployment Period:December 2002 to February 2003 (2 Months)Duties and Responsibilities:Laguna, Philippines Job description: Ensuring that the incoming materials are with good quality and as per standard set by the company prior to issuance for production.
Mechanical Engineer
Industry:Not ApplicableEmployment Period:March 2008 to October 2013 (67 Months)Duties and Responsibilities:Duties and Responsibilities: • Serve as the site representative for all matters related to construction quality assurance of mechanical works. This includes reviewing contractor's mechanical/technical submittals, shop drawings, value engineering proposals, RFI's and coordination issues. • Liaise with the Client's engineers and with the local authorities and ministerial agencies having jurisdiction over the project. Review contractor's mechanical change order proposals and prepare any appropriate recommendations to Project Manager for review. • Witness testing and commissioning of the works. Assist with the final inspection of the work and to monitor completion of the work. Managing and supervising Mechanical Inspector for each project. Assessment of progress on site and advising the Project Manager of the areas where the works are being held up. Assist the Project Manager in handling contractual and technical issues that arises within the project.
Mechanical Engineer
Industry:Not ApplicableEmployment Period:November 2007 to February 2008 (3 Months)Duties and Responsibilities:Office, Unit 503 Abdullah bin Darwish Bldg. Salam Street, P.O. Box 48187, Abu Dhabi, UAE Project: Porcellan Ceramic Factory Project Project Management and Supervision Consultants
Industry:Not ApplicableEmployment Period:September 2010 to May 2012 (20 Months)Duties and Responsibilities:Drainage, Shooting Range, Fuel & Gas, Irrigation, BMS and HVAC systems from September of 2010 till May 2012.
Industry:Not ApplicableEmployment Period:August 2008 to August 2010 (24 Months)Duties and Responsibilities:( QR 600 Million) Project Responsible for providing full project management and construction supervision of Plumbing, Fire Protection, Drainage, Fuel & Gas, Kitchen & Laundry, Steam, Irrigation, Water Features, Swimming Pool, Spa, BMS and HVAC systems from August 2008- August 2010. • Bilal Studios 2B+G+10 Residential Bldg. Project • 150 Villas & 39 Apartment Buildings • Doha International Airport - Transit Terminal - Communication Tower - 12 Departure Gates - Cargo Terminal - Qatar Aviation Catering Services
QA/QC Manager
Industry:Not ApplicableEmployment Period:November 2013 to June 2015 (19 Months)Duties and Responsibilities:Duties & Responsibilities: • Reports to the Project Manager and provides assistance and guidance to the project team to achieve the effective implementation of the quality requirements. This includes but is not limited to: • Develops and implements a project Quality Assurance Plan in line with ISO 9001:2008. • Ensures that the quality system are developed and implemented in a manner to ensure efficiency of all activities. • Monitors and reports on the implementation of Company's management system through formal audit activities. • Represents the company regarding its clients, suppliers/sub-contractors, foreign advisors and Certification Authority, regarding the Quality Policy and the follow-up of the requirements of ISO 9001:2008 • Ascertains for the dissemination and the implementation of the Quality Policy and targets of company in all sectors. • Ascertains that the quality system is regularly followed and improved. • Perform audits, where required, of suppliers and subcontractors. • Regularly reports to the Project Manager regarding the development and effectiveness of the Quality Assurance System in Mercury , suggesting subjects for the quality system review. • Cooperates with the Department Managers and the Project Manager for the identification and adoption of improvements of the current Quality Management system and procedures. • Monitors and reports on the implementation of Project Quality Management System through formal audit activities • Will ensure that upon application for the taking over certificate that the client is supplied with a complete set of original and two copies of all Licenses, certificates and approvals as required by the contract. • Oversees the Final Turnover Documentation preparation • Compiles and keeps a copy of all technical literature referenced in all drawings and specifications to be stored on the project site maintained in good order and to be made available to the employees. The QA/QC Department retains overall responsible for collection, compilation and submission of all close out documentation. • Leads the QC engineers, QC Inspectors and site laboratory and provide assistance in any quality system matters applied to the project. • Provides guidance and assistance to all site staff with respect to any aspect of the management system applied to the project. • Performs spot checks on the works and on the quality records for compliance with the procedures and Inspection and Test Plans • Co-ordinates with the independent inspection bodies. • Maintains the site facility for filing quality records • Assists project staff in the preparation of quality documentation, such as Method Statements, Inspection & Test Plans and work procedures, Quality Control Plans for special processes. • Reviews ITPs • Ensures by random checks that the documents used in the work section are controlled according to the Document & Data Control Procedure. • Responsible for the analysis of non-conformances and involved in the proposal, implementation and follow-up of corrective and preventive actions. • Ensures that subcontractors and suppliers implement the applicable controls specified in the project PQAP and the identified management system documentation. • Ensures implementation of the Quality Control system by the subcontractors. • Promotes quality throughout the project ensuring all staff and sub-contractors are adequately trained and aware of the project quality plan and requirements through induction training for all QC staff, inspectors and engineers. • Ensure all project and specification testing and inspection requirements are incorporated into the ITP's • Creates document formats for Document Control Manager and Handing over & Training Manager. • Maintains Snag List Records. • Investigates and reports all non-conformances and provides corrective and preventive measures. • Creates document process and procedures. • Creates O&M Index and issue to DCM and Handing over Manager. • Guides and trains QC Engineer for witnessing the Test and Commissioning. • Conducts training to all departments for their roles and responsibilities.
Facilities Management & Maintenance Head
Industry:Not ApplicableEmployment Period:January 1970 to January 1970 (1 Month)Duties and Responsibilities:Tabaco/Legazpi City March 3,2017 - April 2, 2018 Position: Facilities Management & Maintenance Head Duties & Responsibilities: • Manages and coordinates the administrative and operational staff, systems, and activities that ensure optimal functioning and maintenance of all LCC Supermarket Branches. • Directs the maintenance of all building systems including mechanical, electrical, fire/life safety, plumbing, and waste management. • Prepares and implements preventive maintenance schedules. Manages and trains a staff of employees in the general maintenance of buildings, grounds, infrastructures, equipment. • Ensures facilities maintenance work follows safety standards, conforms to specifications, and work order are tracked and completed within the budgeted guidelines. • Oversee contractors engaged for facility renovation projects. • Coordinate maintenance worker efforts to make sure employer property like buildings and grounds are kept up • Identify areas for improvement and assign workers to take care of issues • Develop maintenance schedules and enforce them among maintenance staff • Respond to emergency calls for maintenance • Manage the set up and take down of different events • Perform troubleshooting to solve minor repair issues • Communicate plans for upper level improvements to maintenance worker staff • Contact and schedule repairmen and extra help as needed • Perform administrative tasks as required • Delegate tasks to meet maintenance schedule and satisfy employer needs. • Design Air conditioning, Fire Protection, Plumbing and Smoke Management System of New LCC Malls in Polangui, Sorsogon and Masbate. • Review design drawings for Electrical, FDAS, Civil and Architectural Drawings that has the impact on Supermarket Operation. • Conduct Audit of the existing facilities and electromechanical systems for functionality and efficiency and provide recommendation accordingly.
Senior Mechanical Engineer
Industry:Not ApplicableEmployment Period:May 2012 to January 1970 (1 Month)Duties and Responsibilities:• Al Wajba Clubhouse ( QR 1 Billion) Project Responsible for providing full project management and construction supervision of Plumbing, Fire Protection, Drainage, Fuel & Gas, Irrigation and HVAC systems, from May of 2012 till present. • Emiri Guards Residence and Administration Building at Al Wajba Projects- QR 1 Billion Project Cost Designated as a Senior Mechanical Engineer and responsible for providing full project management and construction supervision of Plumbing, Fire Protection,
Project Manager
Industry:Not ApplicableEmployment Period:May 2016 to February 2017 (9 Months)Duties and Responsibilities:Pan Century Surfactants Plant Rehabilitation Project Brgy. Osmeῆa, Jose Panganiban, Camarines Norte Brief Description of the Project: Goldwyn Contractors and Allied Services awarded as one of the Major Mechanical Contractor for the Pan Century Plant Rehabilation located in Brgy. Osmeῆa, Jose Panganiban, Camarines Norte. This Refinery Plant produces Glycerine, Methanol, Fatty Alcohol and Fatty Acids from Coconut Oil, Palm Oil and used Vegetable oil from the country's fast food chain. We are engaged in dismantling, replacement of steel structures of the fatty alcohol processing and glycerine production steel structure. Replacement of the utility piping and Pipe steel structure supports such as the Cooling Water Line, Bunker Fuel Oil Line, Diesel Fuel Line, Eye Wash Line, Steam Line, Filtered Water Line, Fire Hydrant Line, Nitrogen Line, Raw Water Line, Boiler Auxilliary Piping, Waste Water Line, Pump and Motor Reconditioning and Installation and other Structural Works. Painting works was part of our contract for the steel structures using high grade Zinc Chromate as epoxy primer and High Marine grade epoxy paint as the final coating to protect the structures from corrosion as the plant is located near sea shore. Duties & Responsibilities: • Oversee and manage the schedule of the fabrication of steel columns, rafters, flanges and other steel structure accessories. • Planning, scheduling, and supervision of the dismantling of the old steel structure for replacement. • Planning, scheduling and supervision of the erection of the new steel structure. • Evaluation of the steel structure integrity, providing temporary supports on the critical areas and carefully planning the dismembering of a steel structure in order not to affect the others. • Preparing 3 weeks look ahead program. Planning and scheduling of the equipment and manpower requirements of the task ahead. • Schedule the project in logical steps and budget time required to meet deadlines. • Determine manpower requirements and dispatch workers to construction sites. • Inspect and review projects to monitor compliance with building and safety codes, and other regulations. • Interpret and explain plans and contract terms to administrative staff, workers, and clients, representing the owner or developer. • Prepare contracts and negotiate revisions, changes and additions to contractual agreements with architects, consultants, clients, suppliers and subcontractors. • Obtain all necessary permits and licenses. • Conduct Tool Box Meeting and serve as the Safety Officer of the Project. • Requisition supplies and materials to complete construction projects. Prepare and submit budget estimate, progress report and cost tracking reports. • Develop and implement quality control programs. • Take actions to deal with the results of delays, bad weather, or emergencies at construction site. • Plan, organize, and direct activities concerned with the construction and maintenance of structures, facilities, and systems. • Investigate damage, accidents, or delays at construction sites, to ensure that procedures are carried-out properly. • Evaluate construction methods and determine cost-effectiveness of plans, using computers. • Interpret and explain technical drawings and data to ensure all workers understand the works before start up • Select, hire, and instruct laborers and subcontractors Collaborate with engineers, and other construction and building specialists.
Operations Manager
Industry:Not ApplicableEmployment Period:April 2018 to January 2020 (21 Months)Duties and Responsibilities:Major Projects: • Fire Protection & Sprinkler System - John Wesley College Dormitory, Tuguegarao City • FDAS Installation, Testing & Commissioning- John Wesley College Dormitory, Tuguegarao City • FDAS Installation, Testing & Commissioning - 6th Flr. World Commerce Place, BGC, Taguig, City • Rehabilitation of Cooling Tower & Piping - Makati Stock Exchange • Rehabilitation of Cooling Tower & Piping - Metropoint Mall, Pasay City • Design & Installation of Staircase Pressurization and Smoke Extract System - Metropoint Mall, Pasay City • Technical Assessment & Audit of Airconditioning System- Makati Stock Exchange • Technical Assessment & Audit of Smoke Management Sytem- Landbank of the Philippines Bldg. Malate, Manila Duties and Responsibilities: • Responsible for Project Management &Technical Supervision. • Responsible for the Cost Estimation, BOQ Preparation, Planning, Engineering, Procurement and Project Execution of Fire Protection, Mechanical, Fire Alarm Detection System and Electrical System • Responsible for the Testing & Commissioning of FDAS, Fire Sprinkler System, Electrical System, HVAC and other mechanical system. • Responsible for the running day-to-day operations of the construction business and guiding general business strategy. • Provide inspired leadership for the organization. • Make important policy, planning, and strategy decisions. • Develop, implement, and review operational policies and procedures. • Assist HR with recruiting when necessary • Help promote a company culture that encourages top performance and high morale • Oversee budgeting, reporting, planning and auditing • Identify and address problems and opportunities of the company • Support worker communication with the management team.
Education History

Field of Study:

Engineering (Mechanical)

Major:

Industrial Plant

Graduation Date:

March 2001

Located In:

Philippines

License and Certification:

Not Applicable

Skills

★★★ Advanced:
Not Applicable

★★ Intermediate:
Not Applicable

Work at Home Capabilities

Internet Bandwidth:

Between 5mbps to 100mbps

Working Environment:

Private Room

Speed Test Result:

Not Applicable

Internet Type:

Fiber

Hardware Type:

Laptop

Brand Name:

Dell

Processor:

AMD Ryzen 5

Operating System:

Windows 10