Candidate No. 480716
PLAY AUDIO
Jhun

Engineering

Mechanical Engineer

Skills

★★★ Advanced:

AutoCAD, 2D Modeling, Project Management, Quantity Surveying, more

★★ Intermediate:

Microsoft Office, Microsoft Project, Primavera, more

Hourly Rate Gauge

Today's value  AUD $13.23

$11.76

if $ 1 = PHP 42

$14.50

if $ 1 = PHP 30
Currency Fluctuation Range

*includes service fee. Please note that hourly rates are linked to the exchange rate, and fluctuate slightly from month to month.

Employment Preferences

Availability:

 Part Time Full Time

Preferred Timezone:

Australian Western Standard Time, Australian Central Standard Time, Australian Eastern Standard Time

Hourly & Monthly Rate:
(inclusive of service fee)

Part Time: AUD $13.23 per hour or $1146.87 per month
Full Time: AUD $5.01 per hour or $869.23 per month

*Plus GST for Australian Businesses
Remote Staff Recruiter Comments
Jhun has a bachelor's degree in Mechanical Engineering and is a registered Mechanical Engineer.

He has been working for almost 19 years now and has handled different roles which required him to do different tasks.

He is adept in using the following tools:
  • AutoCAD 
  • Primavera P6
  • Microsoft Project
  • MS Office Suite
  • Adobe Acrobat
  • Photoshop
He is skilled in creating designs for HVAC, mechanical, electrical, plumbing, fire protection with electrical implementation and design calculation.

He has worked overseas mostly in the Middle East, Africa and Southeast Asia.

Projects he has been involved with include, residential, commercial buildings, highrise towers, military facilities (US and UK) and airports (local and overseas) just to name a few.

He has experience with cost estimation and quantity surveying both locally and with projects overseas.

Other skills he possess include the following:
  • Design management 
  • Contract management 
  • Contract negotiation
  • Construction management
  • MEP Coordination
  • MEP Design
  • Project management
  • Quality assurance
One of the highlights of his career was his most recent project where he was working as a Chief Mechanical Engineer and it was for the development of the Phnom Penh International Airport.

He is available to work part-time or full-time and can start after a week.

Predictive Index Behavioral Profile - Specialist
https://www.predictiveindex.com/reference-profile/specialist/

Strongest Behaviors
  • Driven to protect the company against risk by thoroughly leveraging their background and strictly following “the book.”
  • Detail-oriented and precise; follow-through is deep and literal to ensure tasks were completed in accordance with quality standards.
  • Operationally, as opposed to socially, focused. Thinks, in specific terms, about what needs to be done and how to do it accurately and flawlessly; follows, in a literal way, that execution plan.
Behavioral Summary

Jhun is a very conscientious person, particularly attentive to, careful of, and accurate with the details involved in the job. Identifies problems, and enjoys solving them, particularly within own area of expertise.

Reserved, serious, and always concerned with the exact correctness of the work. Self-discipline, sense of duty, and respect for authority and tradition are strong qualities in Jhun, who takes responsibilities very seriously.

 
Employment History
Risk Mitigation Engineer
Industry:Chemical / Fertilizers / PesticidesEmployment Period:April 2004 to August 2006 (28 Months)Duties and Responsibilities:
  • Risk Management via Root Cause Analysis.
  • Strategic Planning.
  • Resource Assignment and Provision Management.
Project Engineer
Industry:Construction / Building / EngineeringEmployment Period:August 2006 to March 2008 (19 Months)Duties and Responsibilities:
  • Supervised Contractors’ Compliance.
  • Safety Implementation and Quality control.
  • Progress Reporting and Evaluation for billing and scheduling.
MEP Engineer/Design Coordinator
Industry:Construction / Building / EngineeringEmployment Period:March 2008 to March 2009 (12 Months)Duties and Responsibilities:
  • AutoCAD Design Development of HVAC, Plumbing, and Fire Protection Layouts.
  • Provided Construction Technical Support.
  • Coordination Meetings.

 

MEP Engineer/Design Coordinator
Industry:Heavy Industrial / Machinery / EquipmentEmployment Period:April 2009 to January 2010 (9 Months)Duties and Responsibilities:
  • Installation and Construction Management of mechanical, electrical, plumbing, and fire protection systems.
  • Provided technical support and engineering consultations for design, coordination of building, services construction, and program modifications.
  • Conducts weekly coordination MEP meetings.
MEP Quality Control Engineer
Industry:Construction / Building / EngineeringEmployment Period:October 2011 to June 2013 (20 Months)Duties and Responsibilities:
  • Supervised Project Implementations and Coordination.
  • Vendor Procurement and Material Submittals Reviews for Requirement Compliance.
  • MEP QA/QC Officer‐In‐charge for procurement documents and material submittals reviews and compliance management.
Alternate QC Manager
Industry:Construction / Building / EngineeringEmployment Period:February 2013 to June 2013 (4 Months)Duties and Responsibilities:
  • Supervised Installation of Camp Shorabak’s two 1.2MW Government Furnish Equipment (GFE) Generators for their Power Plant Expansion and Installation of their Mechanical and Electrical Systems of Wastewater Treatment Plant.
  • Supervised MEP QA/QC works parallel to ANA 215th Corps. Headquarters’ Phase I and II engineering‐‐MEP Specialized Quality Control Engineer.
  • Reviewed Contractors’ progress reports and payments.
Quality Control Manager Engineer
Industry:Construction / Building / EngineeringEmployment Period:June 2013 to October 2014 (16 Months)Duties and Responsibilities:
  • Administered Contract documents and Plans provided Site Quality Control Program Consultations.
  • Three-phase Quality Control Inspection.
  • Vendor Procurement and Material Submittals Reviews for Requirement Compliance .
  • QCS-generated USACE QC reporting and Sub-contractor Coordination.
Consultant
Industry:Construction / Building / EngineeringEmployment Period:April 2018 to January 2023 (57 Months)Duties and Responsibilities:
  • Planning, Scheduling, Budgeting, and Implementation of Project
  • Progress monitoring and reporting, Project Coordination
  • Designer, Project team Lead, Project Coordination
  • Supervision of Testing and Commissioning of chilled water system-air conditioning, electrical system, and communication system included in the Contract.
Construction Manager
Industry:Construction / Building / EngineeringEmployment Period:January 2016 to January 2016 (1 Month)Duties and Responsibilities:
  • Prepared Mechanical, Plumbing and Fire Protection Engineering Designs and Specifications. 
  • Project Supervision and Coordination.
  • Scheduling and Budgeting Proposals.
MEP Engineer/Design Coordinator
Industry:Heavy Industrial / Machinery / EquipmentEmployment Period:June 2010 to August 2011 (14 Months)Duties and Responsibilities:
  • HVAC, plumbing, fire protection and electrical system Engineeringdesigns and specifications Reviews for AFCEC for approvals.
  • Conducted AFCEC Coordination Meetings for Submittals Reviews and Compliance Assurance.
  • Submittals Validation (Site Inspection).
Construction Manager
Industry:Construction / Building / EngineeringEmployment Period:September 2016 to September 2017 (12 Months)Duties and Responsibilities:
  • Contract, Plans, and Specification Reviews from front‐end engineering design
  • HVAC, Fire Protection and Plumbing engineering design Review for subcontractors and Coordination with electrical and architecture teams.
  • Conducted Weekly Project Coordination NAVFAC Client Meetings
Chief Mechanical Engineer
Industry:Architectural Services / Interior DesigningEmployment Period:October 2020 to November 2022 (25 Months)Duties and Responsibilities:
  • PMIS system Comparative Reviews of contractors' MEPF Construction and Shop drawings on the design (tendered) drawings for compliance with the design intent, reviews of contractors' construction schedule, installation method statements, material submittals, and MEPF equipment prior to installation, and approvals.
  • Progress Monitoring of MEPF design projects, Supervision on onsite activities of general contractor management, Compliance Monitoring of design, specifications, building codes, and contractual agreements.
  • Reviews Value-Engineering (VE) and carry out Constructability Studies proposed by the Contractor.
  • MEPF Weekly progress presentations and reporting.
  • RPI's and monthly interim progress claims Management and Evaluation.
  • MEPF subject matter expert as technical/consultee resource on the entire MEPF systems.
Mechanical QC Engineer
Industry:Construction / Building / EngineeringEmployment Period:November 2014 to December 2015 (13 Months)Duties and Responsibilities:
  • Compliance Assurance including testing and inspection proceduresfor QC facilities and activities.
  • Three‐phase Quality Control Inspection.
  • Specific Project Supervision on Mechanical, Plumbing and Fire Protection Testing.
  • Hydrostatic test, Pneumatic and Duct air leakage test Supervision.
Education History

Field of Study:

Engineering (Mechanical)

Major:

Mechanical Engineering

Graduation Date:

March 2003

Located In:

Philippines

License and Certification:

Not Applicable

Skills

★★★ Advanced:
AutoCAD, 2D Modeling, Project Management, Quantity Surveying, Material Cost Estimation

★★ Intermediate:
Microsoft Office, Microsoft Project, Primavera

Work at Home Capabilities

Internet Bandwidth:

Greater than 100mbps

Working Environment:

Private Room

Speed Test Result:

Not Applicable

Internet Type:

Fiber

Hardware Type:

Laptop

Brand Name:

Asus

Processor:

i5-11300H

Operating System:

Windows 11