Candidate No. 459853
PLAY AUDIO
Alain Joseph

Engineering

Electrical Engineer

Skills

★★★ Advanced:

Electrical system design, Engineering, AutoCAD, Microsoft Office, more

★★ Intermediate:

Project Documentation, Project Coordination, more

Hourly Rate Gauge

Today's value  AUD $13.23

$11.76

if $ 1 = PHP 42

$14.50

if $ 1 = PHP 30
Currency Fluctuation Range

*includes service fee. Please note that hourly rates are linked to the exchange rate, and fluctuate slightly from month to month.

Employment Preferences

Availability:

 Full Time

Preferred Timezone:

Australian Western Standard Time, Australian Central Standard Time, Australian Eastern Standard Time, New Zealand Daylight Time

Hourly & Monthly Rate:
(inclusive of service fee)

Full Time: AUD $13.23 per hour or $2293.73 per month

*Plus GST for Australian Businesses
Remote Staff Recruiter Comments
  • Alain has worked for more than 8 years, He is a registered Electrical Engineer. He worked in industrial plants, water treatment plants, waste to energy plants and security companies.
  • He was exposed to Primary and secondary electrical designs for High voltages, Medium Voltage and Low Voltage. He prepared 2D design drawings using Microstation for specific mining clients's designs and drafts. He has experience designing and drafting fire, intrusion, and access controls. He worked with clients in Australia and Japan and well versed of their standards. 
  • He was tasked to Design Low-voltage designs for 
    • Single line diagram
    • Schematic diagram
    • PLC, HMI overview and IO Schematics
    • General Arrangement/ Panel Layout
    • Equipment list
  • He used the following software
    • AutoCAD
    • Microstation
    • AutoCAD Electrical
    • Aveva E 3D
    • Powerpac
    • Revit
    • Bluebeam
    • PLC
    • Knowledge in SCADA
  • He can start after 30 days' notice and is open for full-time position.
Predictive Index Behavioral Profile - Altruist 

Strongest Behavior
  • Cautious; follows a well-established and proven plan to avoid making mistakes. Does the background research necessary to have proof to support decisions before action is taken.
  • Detail-oriented and accommodating; most comfortable working as part of a well-defined team for which they produce high-quality output and decisions.
  • Proactively connects quickly to others; open and sharing. Builds and leverages relationships to get work done.
Behavioral Summary

A pleasant and extroverted person, Alain Joseph is an effective communicator, able to stimulate and motivate others while being aware of and responsive to their needs and concerns. Their congenial personality and friendly, interested attitude make them readily approachable. Alain Joseph gets along easily with a wide variety of people.

His drive is directed at working with and for others. He derives particular satisfaction from doing things for others, the company, management, the team, and for the company’s customers. Cooperative and willing, this individual can be a particularly effective teacher and communicator of the company’s policies, programs, and systems

 
Employment History
PROJECT ENGINEER
Industry:Electrical & ElectronicsEmployment Period:November 2014 to September 2015 (10 Months)Duties and Responsibilities:
  • Interpret design plans
  • Conduct preliminary field survey
  • Create request for caution clearance Assign work orders to contractors for execution
  • Perform materials handling/balancing of materials
  • Monitor progress of work orders
  • Prepare RICS/execute major pre-arranged jobs, i.e. involving main lines and LBS’s or Breakers
  • Conduct audit of contractors resources to ensure capability of contractors to carry out assigned work orders
  • Conduct field quality audit to check compliance to Meralco standard
  • Prepare progress report and present to immediate supervisor
 
INSTRUMENT AND CONTROL DRAFTER
Industry:Architectural Services / Interior DesigningEmployment Period:June 2023 to January 2024 (7 Months)Duties and Responsibilities:
  • Preparation of 2D design drawings using MicroStation in the field of EI&C engineering to specific mining Clients’ design and drafting standards.
  • Collaborating with engineers and senior designers on various technical tasks.
  • Compliance with GHD's Corporate Drafting Manual and other relevant systems, tools and processes. CAD-conforming drawings using Clients’ cad-builds.
  • Managing time allocated to given tasks and working to deadlines.
ELECTRICAL DESIGN ENGINEER
Industry:Consulting (Business & Management)Employment Period:October 2022 to June 2023 (8 Months)Duties and Responsibilities:
  • Design of LV Electrical Panel/Switchboards/MCC using AutoCAD Electrical software.
  • Single line diagram
  • Schematic Diagram
  • PLC, HMI overview and IO schematics
  • General Arrangement / Panel Layout
  • Equipment list
PROJECT MANAGER ASSISTANT
Industry:Electrical & ElectronicsEmployment Period:May 2023 to July 2023 (2 Months)Duties and Responsibilities:
  • Provide support to coordinate, direct and monitor activities within the organization.
  • Participate in project meetings to include documentation, administration, and tracking of relevant information and statuses.
  • Monitor and report submittal package comments / markup from client.
  • Design/Draft of Fire Alarm, Intrusion Alarm, Access Control etc. plans as instructed. 
  • Create calculation requirements for battery backup of panel.
  • Create RFI (Request for information) as instructed by Project Manager.
  • Monitor RFI sent out and received responses.
  • Prepare material take-off using Bluebeam software.
ELECTRICAL DRAFTER
Industry:Electrical & ElectronicsEmployment Period:April 2022 to October 2022 (6 Months)Duties and Responsibilities:
Preparation of electrical design document following Australian standards
  • Single line diagram
  • Schematic diagram
  • Interconnection diagram
  • I/O list
  • General arrangement drawings (Panel Drawing, Cable route etc.)
  • Cable Schedule
  • Electrical Calculations (cable sizing using Powerpac software)
ELECTRICAL CONTROL ENGINEER
Industry:Electrical & ElectronicsEmployment Period:November 2015 to April 2022 (77 Months)Duties and Responsibilities:
Involves in Japan domestic projects mainly on incineration plants (Waste to energy).

Preparation of E&I basic design document such as;
  • Single Line Diagram
  • Field Instrument List
  • Load Operation List
  • I/O List
  • Electrical Calculation Sheet
  • Material Requisition
  • DCS Specification Sheet

Checking of vendor’s drawing such as;
  • Equipment Specification & Assembly Drawing
  • Schematic Diagram etc.
  • Evaluation and selection of vendors
Checking of E&I Construction Drawings such as;
  • Cable Tray Layout
  • Equipment Layout
  • Wiring Diagram
  • Instrument Hook-up, etc.
  • IO check
  • Continuity check
  • Troubleshooting
  • Conduct Factory Acceptance Test​​​​​​​
  • Plant testing and commissioning works including preparation of test reports
 

 
PROJECT ENGINEER
Industry:Not ApplicableEmployment Period:November 2014 to September 2015 (10 Months)Duties and Responsibilities:Interpret design plans Conduct preliminary field survey Create request for caution clearance Assign work orders to contractors for execution Perform materials handling/balancing of materials Monitor progress of work orders Prepare RICS/execute major pre-arranged jobs, i.e. involving main lines and LBS's or Breakers Conduct audit of contractors resources to ensure capability of contractors to carry out assigned work orders Conduct field quality audit to check compliance to Meralco standard Load Schedule Prepare progress report and present to immediate supervisor Electrical Cost Estimate AutoCAD Bluebeam Aveva E3D Powerpac Revit Microstation
Industry:Not ApplicableEmployment Period:October 2018 to December 2019 (14 Months)Duties and Responsibilities:Electrical detail design, panel FAT and Cable Tray Layout Wiring Diagram pre-commissioning works of Incineration Equipment Layout Instrument Hook-up, etc. plant. (Waste-to Energy plant) Conduct Factory Acceptance Test Plant testing and commissioning works including preparation of test reports IO check Continuity check Troubleshooting
ELECTRICAL CONTROL ENGINEER
Industry:Not ApplicableEmployment Period:November 2015 to April 2022 (77 Months)Duties and Responsibilities:Involves in Japan domestic projects mainly on incineration plants (Waste to energy). Preparation of E&I basic design document such as; Single Line Diagram Electrical Calculation Sheet Field Instrument List Material Requisition Load Operation List DCS Specification Sheet I/O List Checking of vendor's drawing such as; Experienced being dispatched to Equipment Specification & Assembly Drawing Japan twice; Schematic Diagram etc.
ELECTRICAL DRAFTER
Industry:Not ApplicableEmployment Period:April 2022 to October 2022 (6 Months)Duties and Responsibilities:Client: BRS Electrical Preparation of electrical design document following Australian standards Single line diagram Schematic diagram Interconnection diagram I/O list General arrangement drawings (Panel Drawing, Cable route etc.) Load Schedule Cable Schedule Electrical Calculations (cable sizing using Powerpac software) Electrical Cost Estimate AutoCAD Bluebeam Aveva E3D Powerpac Revit Microstation B4 L4 Malugai St. Hillcrest Village, Brgy. 173, Caloocan City
Industry:Not ApplicableEmployment Period:May 2017 to September 2017 (4 Months)Duties and Responsibilities:Designed and visited site for Evaluation and selection of vendors Incineration Plant
Industry:Not ApplicableEmployment Period:October 2018 to December 2019 (14 Months)Duties and Responsibilities:Electrical detail design, panel FAT and Cable Tray Layout Wiring Diagram pre-commissioning works of Incineration Equipment Layout Instrument Hook-up, etc. plant. (Waste-to Energy plant) Conduct Factory Acceptance Test Plant testing and commissioning works including preparation of test reports IO check Continuity check Troubleshooting
Industry:Not ApplicableEmployment Period:May 2017 to September 2017 (4 Months)Duties and Responsibilities:Designed and visited site for Evaluation and selection of vendors Incineration Plant
ELECTRICAL CONTROL ENGINEER
Industry:Not ApplicableEmployment Period:November 2015 to April 2022 (77 Months)Duties and Responsibilities:Involves in Japan domestic projects mainly on incineration plants (Waste to energy). Preparation of E&I basic design document such as; Single Line Diagram Electrical Calculation Sheet Field Instrument List Material Requisition Load Operation List DCS Specification Sheet I/O List Checking of vendor's drawing such as; Experienced being dispatched to Equipment Specification & Assembly Drawing Japan twice; Schematic Diagram etc.
ELECTRICAL DRAFTER
Industry:Not ApplicableEmployment Period:April 2022 to October 2022 (6 Months)Duties and Responsibilities:Client: BRS Electrical Preparation of electrical design document following Australian standards Single line diagram Schematic diagram Interconnection diagram I/O list General arrangement drawings (Panel Drawing, Cable route etc.) Load Schedule Cable Schedule Electrical Calculations (cable sizing using Powerpac software) Electrical Cost Estimate AutoCAD Bluebeam Aveva E3D Powerpac Revit Microstation B4 L4 Malugai St. Hillcrest Village, Brgy. 173, Caloocan City
PROJECT ENGINEER
Industry:Not ApplicableEmployment Period:November 2014 to September 2015 (10 Months)Duties and Responsibilities:Interpret design plans Conduct preliminary field survey Create request for caution clearance Assign work orders to contractors for execution Perform materials handling/balancing of materials Monitor progress of work orders Prepare RICS/execute major pre-arranged jobs, i.e. involving main lines and LBS's or Breakers Conduct audit of contractors resources to ensure capability of contractors to carry out assigned work orders Conduct field quality audit to check compliance to Meralco standard Load Schedule Prepare progress report and present to immediate supervisor Electrical Cost Estimate AutoCAD Bluebeam Aveva E3D Powerpac Revit Microstation
Education History

Field of Study:

Engineering (Electrical/Electronic)

Major:

Not Applicable

Graduation Date:

March 2014

Located In:

Philippines

License and Certification:

Not Applicable

Skills

★★★ Advanced:
Electrical system design, Engineering, AutoCAD, Microsoft Office, Bluebeam Software, Microsoft Excel

★★ Intermediate:
Project Documentation, Project Coordination

Work at Home Capabilities

Internet Bandwidth:

100 Mbps and above

Working Environment:

Private Room

Speed Test Result:

Not Applicable

Internet Type:

Fiber

Hardware Type:

Laptop

Brand Name:

Lenovo

Processor:

Intel Core i7

Operating System:

Windows 11