Candidate No. 419313
PLAY AUDIO
Henry

Engineering

Electrical Engineer

Skills

★★★ Advanced:

AutoCAD, more

★★ Intermediate:

Electrical system design, more

Hourly Rate Gauge

Today's value  AUD $13.23

$11.76

if $ 1 = PHP 42

$14.50

if $ 1 = PHP 30
Currency Fluctuation Range

*includes service fee. Please note that hourly rates are linked to the exchange rate, and fluctuate slightly from month to month.

Employment Preferences

Availability:

 Full Time

Preferred Timezone:

Australian Eastern Standard Time

Hourly & Monthly Rate:
(inclusive of service fee)

Full Time: AUD $13.23 per hour or $2293.73 per month

*Plus GST for Australian Businesses
Remote Staff Recruiter Comments
  • He is working as an Electrical Estimator for 6 years.
  • He do technical analysis on the data and specifications of the project.
  • He conducts quantity take-offs of all electrical related works from plans and documentations using “Groundplan” software.
  • He prepares spreadsheets for material pricing and contacts suppliers for materials technical details to assure conformity with the job requirements.
  • He performs estimating works using “ConEst Intellibid estimating software”.
  • He also worked as an Electrical Engineer.
  • He review, check and re-calculate all electrical tender documents before proceeding on actual construction.
  • He has been working with Australian clients and working remotely.
  • He can start Immediately
Employment History
Cadet Engineer
Industry:Construction / Building / EngineeringEmployment Period:February 1999 to November 1999 (9 Months)Duties and Responsibilities:1) Training on actual electrical installation, specializing high and medium voltage system.
2) Trainee on electrical estimates, designs and project implementation.
3) Familiarization on electrical tools, equipment’s and materials up to actual application/operation on field.
Project Supervisor
Industry:Construction / Building / EngineeringEmployment Period:November 1999 to November 2000 (12 Months)Duties and Responsibilities:1) Responsible in project supervision and implementation, up to final testing and commissioning. 2) In-charge on materials and quality workmanship from design to final installation.
3) In-charge on safety implementation during working hour.
4) Responsible on project coordination from customer to the company's Project Manager.
Project Engineer
Industry:Construction / Building / EngineeringEmployment Period:November 2000 to May 2002 (18 Months)Duties and Responsibilities:1) Electrical designs, estimates and implementation/installation on Industrial and Commercial Electrical requirements.
2) Testing and commissioning of various electrical devices and equipment from oil immersed transformers, dry type transformers, cables, motors, circuit breakers and other electrical devices.
3) Knowledge in operating electrical testing equipment’s and apparatus.
4) Monitoring and controlling project flow, from material delivery, on-time completion of specific work priorities, quality, safety, and project budgets.
Engineering Supervisor
Industry:Construction / Building / EngineeringEmployment Period:May 2002 to August 2003 (15 Months)Duties and Responsibilities:1) Supervise Electrical Engineering Operations.
2) Checking of estimates, designs and application on fields.
3) Manpower Scheduling on Special Projects.
4) Leads the Testing and Commissioning group, who are in charge on preventive maintenance works.
5) Project management and monitoring.
Electrical Engineer
Industry:Construction / Building / EngineeringEmployment Period:August 2003 to March 2005 (19 Months)Duties and Responsibilities:1) Supervise electrical installation.
2) Maintains the safety of workforce and quality workmanship for client satisfaction.
3) Make electrical designs and estimates.
4) Responsible in securing electrical and building permits.
Electrical Engineer
Industry:Construction / Building / EngineeringEmployment Period:March 2005 to August 2007 (29 Months)Duties and Responsibilities:1) Supervise Electrical Engineering operations. Manpower scheduling, budgeting and monitoring.
2) Supervise Electrical installation projects and preventive maintenance of electrical equipment’s, from power transformers, switchgears and others.
3) Assures the safety and quality workmanship of all electrical projects and similar accounts. Responsible in the coordination from client to main office.
4) Make electrical designs, estimates and proposals for prospective customers, mostly industrial plants.
5) Do technical sales to support the sales department on technical concerns.
 
Electrical Engineer
Industry:Construction / Building / EngineeringEmployment Period:September 2007 to November 2008 (14 Months)Duties and Responsibilities:1) Makes designs, computations and estimates, shop drawings and as-build drawings.
2) Responsible for all electrical works on handled projects.
3) Responsible for quality workmanship and quality of installed materials.
4) Responsible for on-time completion of projects.
5) Project management and monitoring.
Electrical Engineer
Industry:Call Center / IT-Enabled Services / BPOEmployment Period:November 2009 to March 2011 (16 Months)Duties and Responsibilities:1) Review, check and re-calculate approved electrical tender documents before proceeding on actual construction.
2) Responsible for Quantity survey of all electrical components installed on site for billing purposes.
3) Responsible for quality workmanship and quality of installed materials.
4) Responsible for on-time completion of projects.
5) Coordinates with suppliers for proper materials and on-time delivery.
6) Review and study the technical data of all electrical materials and equipment’s and submit recommendations to the project manager and purchasing department before purchasing.

Projects handled: 4 Storey Commercial Complex (Investment Complex – Tripoli) Scope of works:
1. Lighting connections – dimming system, EIB system
2. Power connections from outlets up to medium voltage switchgear (11 KV)
3. Building management system – full building integration including HVAC equipment’s.
4. Telecommunication and data system
5. Television system
6. Fire alarm and prevention system
7. Security and intrusion prevention system – CCTV’s and automatic door locks
8. Fully automatic car parking system
9. Lightning and grounding system
Electrical Engineer
Industry:Construction / Building / EngineeringEmployment Period:February 2012 to February 2013 (12 Months)Duties and Responsibilities:1) Makes quantity take-off, computations and estimates, shop drawings and as-build drawings.
2) Responsible for all electrical works on handled projects.
3) Responsible for on-time completion of projects.
4) Review, check and re-calculate all electrical tender documents before proceeding on actual construction.
5) Responsible for Quantity survey of all electrical components installed on site for billing purposes.
6) Responsible for quality workmanship and quality of installed materials. 7) Review and study the technical data of all electrical materials and equipment’s.
Electrical Engineer
Industry:Construction / Building / EngineeringEmployment Period:April 2013 to June 2014 (14 Months)Duties and Responsibilities:1) Review, check and re-calculate approved electrical tender documents before proceeding on actual construction.
2) Responsible for Quantity survey of all electrical components installed on site for billing purposes.
3) Responsible for quality workmanship and quality of installed materials.
4) Responsible for on-time completion of projects.
5) Coordinates with suppliers for proper materials and on-time delivery.

6) Review and study the technical data of all electrical materials and equipment’s and submit recommendations to the project manager and purchasing department before purchasing.
Electrical Estimator
Industry:Call Center / IT-Enabled Services / BPOEmployment Period:February 2015 to September 2016 (19 Months)Duties and Responsibilities:1) Reviews and study technical data and specifications.
2) Conduct quantity take-offs of all electrical related works from plans and documentations using “Bluebeam Revu”.
3) Prepares spreadsheets for material pricing.
4) Performs estimating works using “Buildsoft global estimating software”
5) Performs autocad modification.
6) Performs lighting and fire alarm & detection, power, security and communications layouts.
7) Performs other task as assigned by the Estimating Manage
Electrical Estimator
Industry:Call Center / IT-Enabled Services / BPOEmployment Period:September 2016 to January 2018 (16 Months)Duties and Responsibilities:1) Reviews and study technical data and specifications.
2) Conduct quantity take-offs of all electrical related works from plans and documentations using “Bluebeam Revu”.
3) Prepares spreadsheets for material pricing.
4) Performs estimating works using “Buildsoft global estimating software”
5) Performs autocad modification.
6) Performs lighting and fire alarm & detection, power, security and communications layouts.
7) Performs other task as assigned by the Estimating Manager.
Electrical Estimator
Industry:Call Center / IT-Enabled Services / BPOEmployment Period:January 2018 to February 2019 (13 Months)Duties and Responsibilities:1) Analysis of the technical data’s and specifications.
2) Conduct quantity take-offs of all electrical related works from plans and documentations using “Bluebeam Revu”.
3) Prepares spreadsheets for material pricing.
4) Contacts suppliers for materials technical details to assure conformity with the job requirements.
5) Sends RFI’s to consultants/builders when needed for clarifications.
6) Performs other task as assigned by the Estimating Manager.
Electrical Estimator
Industry:Call Center / IT-Enabled Services / BPOEmployment Period:March 2020 to September 2021 (18 Months)Duties and Responsibilities:1) Analysis of the technical data’s and specifications.
2) Conduct quantity take-offs of all electrical related works from plans and documentations using “Groundplan” software.
3) Prepares spreadsheets for material pricing.
4) Contacts suppliers for materials technical details to assure conformity with the job requirements.
5) Sends RFI’s to consultants/builders when needed for clarifications.
6) Performs estimating works using “ConEst Intellibid estimating software”.
7) Working on some AutoCad works.
8) Modeling works using Dialux software.
9) Performs other task as assigned by the Estimating Manager.
Electrical Engineer
Industry:Not ApplicableEmployment Period:January 1970 to January 1970 (1 Month)Duties and Responsibilities:1) Supervise Electrical Engineering operations. Manpower scheduling, budgeting and monitoring. 2) Supervise Electrical installation projects and preventive maintenance of electrical equipment's, from power transformers, switchgears and others. 3) Assures the safety and quality workmanship of all electrical projects and similar accounts. Responsible in the coordination from client to main office. 4) Make electrical designs, estimates and proposals for prospective customers, mostly industrial plants. 5) Do technical sales to support the sales department on technical concerns.
Electrical Engineer
Industry:Not ApplicableEmployment Period:January 1970 to January 1970 (1 Month)Duties and Responsibilities:1) Makes designs, computations and estimates, shop drawings and as-build drawings. 2) Responsible for all electrical works on handled projects. 3) Responsible for quality workmanship and quality of installed materials. 4) Responsible for on-time completion of projects. 5) Project management and monitoring. Projects handled at Saudi Build Co.: 1) Prince Al Maather Palace - Motor pool, garage and labor accommodation buildings. 2) Princess Bandari Private Villa 1 - Three (3) Storey Residential building. 3) Princess Bandari Private Villa 2 - Three (3) Storey Residential building. 4) King Abdullah's Library - Four (4) Storey Library Scope of works: 1. Lighting connections - dimming system, EIB system 2. Power connections from outlets up to medium voltage switchgear (11 KV) 3. Telecommunication and data system 4. Television system 5. Fire alarm and prevention system 6. Security and intrusion prevention system - CCTV's and automatic door locks 7. Lightning and grounding system
Electrical Engineer
Industry:Not ApplicableEmployment Period:January 1970 to January 1970 (1 Month)Duties and Responsibilities:Electrical Company (JAMED) - Riyadh Riyadh, Kingdom of Saudi Arabia February 12, 2012 - February 12, 2013 1) Makes quantity take-off, computations and estimates, shop drawings and as-build drawings. 2) Responsible for all electrical works on handled projects. 3) Responsible for on-time completion of projects. 4) Review, check and re-calculate all electrical tender documents before proceeding on actual construction. 5) Responsible for Quantity survey of all electrical components installed on site for billing purposes. 6) Responsible for quality workmanship and quality of installed materials. 7) Review and study the technical data of all electrical materials and equipment's. Projects handled at JAMED: 1) ITCC Data Center 2) Al Tameer Residential Palace Scope of works: 1. Lighting System 2. Small Power System 3. Equipment Power System 4. Building management system 5. SCADA System 6. Telecommunication and data system 7. Television system 8. Fire alarm and prevention system 9. Security and intrusion prevention system 10. Lightning and grounding system
Electrical Engineer
Industry:Not ApplicableEmployment Period:January 1970 to January 1970 (1 Month)Duties and Responsibilities:1) Review, check and re-calculate approved electrical tender documents before proceeding on actual construction. 2) Responsible for Quantity survey of all electrical components installed on site for billing purposes. 3) Responsible for quality workmanship and quality of installed materials. 4) Responsible for on-time completion of projects. 5) Coordinates with suppliers for proper materials and on-time delivery. 6) Review and study the technical data of all electrical materials and equipment's and submit recommendations to the project manager and purchasing department before purchasing. Projects handled: 4 Storey Commercial Complex (Investment Complex - Tripoli) Scope of works: 1. Lighting connections - dimming system, EIB system 2. Power connections from outlets up to medium voltage switchgear (11 KV) 3. Building management system - full building integration including HVAC equipment's. 4. Telecommunication and data system 5. Television system 6. Fire alarm and prevention system 7. Security and intrusion prevention system - CCTV's and automatic door locks 8. Fully automatic car parking system 9. Lightning and grounding system
Electrical Engineer
Industry:Not ApplicableEmployment Period:January 1970 to January 1970 (1 Month)Duties and Responsibilities:1) Review, check and re-calculate approved electrical tender documents before proceeding on actual construction. 2) Responsible for Quantity survey of all electrical components installed on site for billing purposes. 3) Responsible for quality workmanship and quality of installed materials. 4) Responsible for on-time completion of projects. 5) Coordinates with suppliers for proper materials and on-time delivery. 6) Review and study the technical data of all electrical materials and equipment's and submit recommendations to the project manager and purchasing department before purchasing. Projects handled: 4 Storey Commercial Complex (Investment Complex - Tripoli) Scope of works: 1. Lighting connections - dimming system, EIB system 2. Power connections from outlets up to medium voltage switchgear (11 KV) 3. Building management system - full building integration including HVAC equipment's. 4. Telecommunication and data system 5. Television system 6. Fire alarm and prevention system 7. Security and intrusion prevention system - CCTV's and automatic door locks 8. Fully automatic car parking system 9. Lightning and grounding system
Industry:Not ApplicableEmployment Period:January 1970 to January 1970 (1 Month)Duties and Responsibilities:1) Reviews and study technical data and specifications. 2) Conduct quantity take-offs of all electrical related works from plans and documentations using "Bluebeam Revu". 3) Prepares spreadsheets for material pricing. 4) Performs estimating works using "Buildsoft global estimating software" 5) Performs autocad modification. 6) Performs lighting and fire alarm & detection, power, security and communications layouts. 7) Performs other task as assigned by the Estimating Manage
Industry:Not ApplicableEmployment Period:January 1970 to January 1970 (1 Month)Duties and Responsibilities:1) Reviews and study technical data and specifications. 2) Conduct quantity take-offs of all electrical related works from plans and documentations using "Bluebeam Revu". 3) Prepares spreadsheets for material pricing. 4) Performs estimating works using "Buildsoft global estimating software" 5) Performs autocad modification. 6) Performs lighting and fire alarm & detection, power, security and communications layouts. 7) Performs other task as assigned by the Estimating Manager. Beepo, Inc. (Outsource Company) Electrical Estimator Philexcel Business Park, Building 9, M.A. Roxas Highway, Clark Freeport Zone, Pampanga, Philippines
Industry:Not ApplicableEmployment Period:January 1970 to January 1970 (1 Month)Duties and Responsibilities:1) Analysis of the technical data's and specifications. 2) Conduct quantity take-offs of all electrical related works from plans and documentations using "Bluebeam Revu". 3) Prepares spreadsheets for material pricing. 4) Contacts suppliers for materials technical details to assure conformity with the job requirements. 5) Sends RFI's to consultants/builders when needed for clarifications. 6) Performs other task as assigned by the Estimating Manager. Shore 360 (Outsource Company) Electrical Estimator Philexcel Business Park, Building 6, M.A. Roxas Highway, Clark Freeport Zone, Pampanga, Philippines
Industry:Not ApplicableEmployment Period:January 1970 to January 1970 (1 Month)Duties and Responsibilities:(Part - Time Job) 1) Analysis of the technical data's and specifications. 2) Conduct quantity take-offs of all electrical related works from plans and documentations using "Groundplan" software. 3) Prepares spreadsheets for material pricing. 4) Contacts suppliers for materials technical details to assure conformity with the job requirements. 5) Sends RFI's to consultants/builders when needed for clarifications. 6) Performs estimating works using "ConEst Intellibid estimating software". 7) Working on some AutoCad works. 8) Modeling works using Dialux software. 9) Performs other task as assigned by the Estimating Manager. Kinetic Innovative Staffing (Outsource Company) Electrical Estimator Level 17, 40 Creek Street, Brisbane Queensland, Australia
Electrical Estimator
Industry:Not ApplicableEmployment Period:January 1970 to January 1970 (1 Month)Duties and Responsibilities:1) Analysis/Review of the technical data and specifications. 2) Conduct quantity take-offs of all electrical related works from plans and documentations using "Bluebeam" software. 3) Prepares spreadsheets for material pricing. 4) Contact suppliers for materials technical details to assure conformity with the job requirements. 5) Sends RFI's to consultants/builders when needed for clarifications. 6) Performs estimating works supply and installations. 7) Performs other task as assigned by the Estimating Manager. Kinetic Innovative Staffing (Outsource Company) Electrical Estimator Level 17, 40 Creek Street, Brisbane Queensland, Australia
Education History

Field of Study:

Engineering (Electrical/Electronic)

Major:

Not Applicable

Graduation Date:

April 1998

Located In:

Philippines

License and Certification:

Not Applicable

Skills

★★★ Advanced:
AutoCAD

★★ Intermediate:
Electrical system design

Work at Home Capabilities

Internet Bandwidth:

Between 5mbps to 100mbps

Working Environment:

Private Room

Speed Test Result:

Download: 33.21, Upload: 7.11

Internet Type:

Cable

Hardware Type:

Desktop

Brand Name:

Customized

Processor:

AMD Ryzen 3

Operating System:

Windows 10